Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
440 707 18.00 1220.00 2440.00 FA E2 BB CC 40 (Sisa: 0)
439 708 18.00 1220.00 2440.00 FA E2 BB CC 34 (Sisa: 0)
438 513 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
437 715//714 6.00 1220.00 2440.00 FA B4 BB CC 65 (Sisa: 0)
436 702//701 20.00 1220.00 2440.00 MA B4 G1 31 (Sisa: 0)
435 411 2.70 920.00 2440.00 FA E1 UTY 190 (Sisa: 0)
434 602 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
433 682//697 20.50 1220.00 2440.00 MA B4 G1 22 (Sisa: 0)
432 536 20.50 1220.00 2440.00 MA B4 G1 19 (Sisa: 0)
431 536 20.50 1220.00 2440.00 MA B4 G1 21 (Sisa: 0)
Total: 499 data
< Prev Halaman 11 dari 50 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
129 134 2026-09-05 September 36 420 Shift A DS1 40 14.60 0.022897 0.915878 Delete
128 133 2026-09-05 9 36 464 A DS1 49 14.60 0.022897 1.121951 Delete
127 130 2026-09-05 September 36 482 Shift A DS1 115 2.40 0.003181 0.365867 Delete
126 129 2026-09-05 September 36 433 Shift A DS1 200 2.40 0.003181 0.636291 Delete
125 128 2026-09-05 September 36 441 Shift A DS1 200 2.40 0.003181 0.636291 Delete
124 127 2026-09-05 September 36 460 Shift B DS2 170 2.40 0.003181 0.540847 Delete
123 126 2026-09-05 September 36 330 Shift A DS1 79 9.00 0.023814 1.881338 Delete
122 102 2026-09-05 September 36 999 Shift A DS1 100 6.00 0.014884 1.488400 Delete
121 95 2026-09-05 September 36 230 Shift A DS1 28 18.00 0.050606 1.416957 Delete
120 82 2026-09-05 September 36 230 Shift A DS1 30 18.00 0.050606 1.518168 Delete
Menampilkan Halaman 43 dari 53 (Total: 521 data)