Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
408 664 11.60 1220.00 2440.00 MA B4 G1 63 (Sisa: 0)
407 651 11.60 1220.00 2440.00 MA B4 G1 39 (Sisa: 0)
406 646 2.70 1220.00 2440.00 FA E1 UTY 187 (Sisa: 0)
404 477 11.60 910.00 1820.00 FA B4 G2 34 (Sisa: 0)
403 483 18.00 1220.00 2440.00 FM E2 CI 17 15 (Sisa: 15)
402 483//491 18.00 1220.00 2440.00 FM E1 UTY E 5 (Sisa: 5)
399 x 2.70 1220.00 2440.00 FA E2 CI D2 111 (Sisa: 0)
398 693//692 5.00 915.00 1830.00 FM E2 LKL C11 7 100 (Sisa: 0)
397 710 5.00 920.00 2440.00 FM E1 UTY E 100 (Sisa: 0)
396 x 11.20 1220.00 2440.00 FM E1 BB CC 11 (Sisa: 0)
Total: 499 data
< Prev Halaman 14 dari 50 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
161 180 2026-09-08 September 37 864 Shift A DS1 59 9.00 0.023814 1.405050 Delete
160 161 2026-09-08 9 37 546 A DS1 38 15.00 0.041675 1.583658 Delete
159 120 2026-09-08 September 37 968 Shift A DS1 80 9.00 0.023814 1.905152 Delete
158 119 2026-09-08 September 37 961 Shift A DS1 68 9.00 0.023814 1.619379 Delete
157 118 2026-09-08 September 37 331 Shift A DS1 76 9.00 0.023814 1.809894 Delete
156 288 2026-09-07 September 37 671 Shift B DS2 86 5.00 0.011907 1.024019 Delete
155 195 2026-09-07 9 37 420//478 A DS1 50 15.00 0.041675 2.083760 Delete
154 194 2026-09-07 September 37 478//471 Shift A DS1 50 15.00 0.041675 2.083760 Delete
153 178 2026-09-07 September 37 x Shift A DS1 51 11.60 0.017846 0.910154 Delete
150 176 2026-09-07 September 37 422 Shift A DS1 29 11.60 0.017846 0.517539 Delete
Menampilkan Halaman 40 dari 53 (Total: 521 data)