Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
403 483 18.00 1220.00 2440.00 FM E2 CI 17 15 (Sisa: 15)
402 483//491 18.00 1220.00 2440.00 FM E1 UTY E 5 (Sisa: 5)
399 x 2.70 1220.00 2440.00 FA E2 CI D2 111 (Sisa: 0)
398 693//692 5.00 915.00 1830.00 FM E2 LKL C11 7 100 (Sisa: 0)
397 710 5.00 920.00 2440.00 FM E1 UTY E 100 (Sisa: 0)
396 x 11.20 1220.00 2440.00 FM E1 BB CC 11 (Sisa: 0)
395 583 11.20 1220.00 2440.00 FM E1 BB CC 40 (Sisa: 0)
394 747 2.70 1220.00 2440.00 FA E1 UTY 199 (Sisa: 0)
393 447 11.60 915.00 1830.00 FA B4 G2 60 (Sisa: 0)
392 515 11.60 915.00 1830.00 FA B4 G2 62 (Sisa: 0)
Total: 515 data
< Prev Halaman 16 dari 52 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
236 209 2026-09-11 September 37 559 Shift B DS2 41 14.60 0.022773 0.933673 Delete
235 208 2026-09-11 September 37 465 Shift B DS2 47 14.60 0.022773 1.070308 Delete
234 166 2026-09-11 September 37 x Shift B DS2 59 9.00 0.023814 1.405050 Delete
233 165 2026-09-11 September 37 x Shift A DS1 57 9.00 0.023814 1.357421 Delete
232 155 2026-09-11 September 37 x Shift A DS1 79 9.00 0.023814 1.881338 Delete
231 257 2026-09-10 September 37 361 Shift A DS1 31 9.00 0.023814 0.738246 Delete
230 255 2026-09-10 September 37 572 Shift A DS1 50 15.00 0.041675 2.083760 Delete
229 254 2026-09-10 September 37 593 Shift B DS2 49 15.00 0.041675 2.042085 Delete
228 253 2026-09-10 September 37 576 Shift B DS2 50 15.00 0.041675 2.083760 Delete
227 248 2026-09-10 9 37 558 A DS1 36 14.60 0.040484 1.457441 Delete
Menampilkan Halaman 34 dari 54 (Total: 536 data)