Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
354 417 20.50 1220.00 2440.00 MA B4 G1 31 (Sisa: 0)
353 x 8.60 915.00 1830.00 MA B4 G2 14 (Sisa: 0)
352 x 8.60 915.00 1830.00 MA B4 G2 7 (Sisa: 0)
351 X 14.60 915.00 1830.00 MA B4 G1 47 (Sisa: 0)
350 126 2.40 915.00 1830.00 FJB E1 UTY E 200 (Sisa: 0)
349 8382 3.70 1230.00 2440.00 FM B4 G1 200 (Sisa: 0)
347 124 2.40 915.00 1830.00 FJB E1 UTY E 191 (Sisa: 0)
346 135 2.40 915.00 1830.00 FJB E1 UTY E 200 (Sisa: 0)
345 125 2.40 915.00 1830.00 FJB E1 UTY E 199 (Sisa: 0)
344 218 9.00 1220.00 2440.00 FM E2 CI 17 66 (Sisa: 0)
Total: 499 data
< Prev Halaman 19 dari 50 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
171 199 2026-09-08 September 37 440//410 Shift A DS1 256 2.40 0.003181 0.814452 Delete
170 198 2026-09-08 September 37 450//440 Shift A DS1 178 2.40 0.003181 0.566299 Delete
169 197 2026-09-08 September 37 128 Shift A DS1 94 2.40 0.003181 0.299057 Delete
168 196 2026-09-08 September 37 535//534 Shift A DS1 40 15.00 0.041675 1.667008 Delete
167 187 2026-09-08 September 37 518 Shift A DS1 98 5.00 0.011907 1.166906 Delete
166 186 2026-09-08 September 37 542 Shift B DS2 90 5.00 0.011907 1.071648 Delete
165 185 2026-09-08 September 37 503 Shift B DS2 100 5.00 0.011907 1.190720 Delete
164 184 2026-09-08 September 37 502 Shift B DS2 96 5.00 0.011907 1.143091 Delete
163 183 2026-09-08 September 37 534 Shift A DS1 31 15.00 0.041675 1.291931 Delete
162 182 2026-09-08 September 37 325 Shift A DS1 80 9.00 0.023814 1.905152 Delete
Menampilkan Halaman 39 dari 53 (Total: 521 data)