Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
293 x 2.70 1220.00 2440.00 FA E1 UTY 190 (Sisa: 0)
292 656 2.70 1220.00 2440.00 FA E1 UTY 192 (Sisa: 0)
291 657 2.70 1220.00 2440.00 FA E1 UTY 184 (Sisa: 0)
290 659 2.70 1220.00 2440.00 FA E1 UTY 146 (Sisa: 0)
289 518 5.00 1230.00 2440.00 FA E2 CI D2 80 (Sisa: 0)
288 671 5.00 1220.00 2440.00 FA E2 CI D2 86 (Sisa: 0)
287 565//555 14.60 1220.00 2440.00 MA B4 G1 22 (Sisa: 0)
286 677//565 14.60 1220.00 2440.00 MA B4 G1 29 (Sisa: 17)
285 334 2.40 915.00 1830.00 FJB E1 UTY E 200 (Sisa: 0)
284 695 2.40 915.00 1830.00 FJB E1 UTY E 200 (Sisa: 0)
Total: 499 data
< Prev Halaman 25 dari 50 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
161 180 2026-09-08 September 37 864 Shift A DS1 59 9.00 0.023814 1.405050 Delete
160 161 2026-09-08 9 37 546 A DS1 38 15.00 0.041675 1.583658 Delete
159 120 2026-09-08 September 37 968 Shift A DS1 80 9.00 0.023814 1.905152 Delete
158 119 2026-09-08 September 37 961 Shift A DS1 68 9.00 0.023814 1.619379 Delete
157 118 2026-09-08 September 37 331 Shift A DS1 76 9.00 0.023814 1.809894 Delete
156 288 2026-09-07 September 37 671 Shift B DS2 86 5.00 0.011907 1.024019 Delete
155 195 2026-09-07 9 37 420//478 A DS1 50 15.00 0.041675 2.083760 Delete
154 194 2026-09-07 September 37 478//471 Shift A DS1 50 15.00 0.041675 2.083760 Delete
153 178 2026-09-07 September 37 x Shift A DS1 51 11.60 0.017846 0.910154 Delete
150 176 2026-09-07 September 37 422 Shift A DS1 29 11.60 0.017846 0.517539 Delete
Menampilkan Halaman 40 dari 53 (Total: 521 data)