Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
293 x 2.70 1220.00 2440.00 FA E1 UTY 190 (Sisa: 0)
292 656 2.70 1220.00 2440.00 FA E1 UTY 192 (Sisa: 0)
291 657 2.70 1220.00 2440.00 FA E1 UTY 184 (Sisa: 0)
290 659 2.70 1220.00 2440.00 FA E1 UTY 146 (Sisa: 0)
289 518 5.00 1230.00 2440.00 FA E2 CI D2 80 (Sisa: 0)
288 671 5.00 1220.00 2440.00 FA E2 CI D2 86 (Sisa: 0)
287 565//555 14.60 1220.00 2440.00 MA B4 G1 22 (Sisa: 0)
286 677//565 14.60 1220.00 2440.00 MA B4 G1 29 (Sisa: 17)
285 334 2.40 915.00 1830.00 FJB E1 UTY E 200 (Sisa: 0)
284 695 2.40 915.00 1830.00 FJB E1 UTY E 200 (Sisa: 0)
Total: 499 data
< Prev Halaman 25 dari 50 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
49 81 2026-09-01 September 36 136 Shift A DS1 188 2.40 0.003181 0.598114 Delete
48 80 2026-09-01 September 36 111 Shift A DS1 198 2.40 0.003181 0.629928 Delete
47 79 2026-09-01 September 36 114 Shift A DS1 140 2.40 0.003181 0.445404 Delete
46 78 2026-09-01 September 36 106 Shift B DS1 200 2.40 0.003181 0.636291 Delete
45 77 2026-09-01 September 36 107 Shift B DS1 194 2.40 0.003181 0.617202 Delete
44 76 2026-09-01 September 36 129 Shift B DS1 182 2.40 0.003181 0.579025 Delete
43 67 2026-09-01 September 36 339 Shift A DS1 196 2.40 0.003181 0.623565 Delete
42 66 2026-09-01 September 36 115 Shift A DS1 90 2.40 0.003181 0.286331 Delete
41 65 2026-09-01 September 36 121 Shift A DS1 100 2.40 0.003181 0.318146 Delete
40 63 2026-09-01 September 36 257/382 Shift A DS1 47 15.00 0.041675 1.958734 Delete
Menampilkan Halaman 51 dari 53 (Total: 521 data)