Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
283 701 2.40 915.00 1830.00 FJB E1 UTY E 166 (Sisa: 0)
282 333 2.40 915.00 1830.00 FJB E1 UTY E 184 (Sisa: 0)
281 641 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
279 663 2.70 1220.00 2440.00 FA E1 UTY 152 (Sisa: 0)
278 623 2.70 1220.00 2440.00 FA E1 UTY 158 (Sisa: 0)
277 658 2.70 1220.00 2440.00 FA E1 UTY 158 (Sisa: 0)
276 632 2.70 1220.00 2440.00 FA E1 UTY 87 (Sisa: 0)
275 622 2.70 1220.00 2440.00 FA E1 UTY 152 (Sisa: 0)
274 621 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
273 580//538 17.60 1220.00 2440.00 MA B4 G1 39 (Sisa: 0)
Total: 499 data
< Prev Halaman 26 dari 50 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
181 224 2026-09-08 September 37 582 Shift A DS1 200 2.70 0.006549 1.309792 Delete
180 224 2026-09-08 September 37 582 Shift A DS1 200 2.70 0.006549 1.309792 Delete
179 222 2026-09-08 September 37 545 Shift A DS1 38 15.00 0.041675 1.583658 Delete
178 221 2026-09-08 September 37 577 Shift A DS1 44 15.00 0.041675 1.833709 Delete
177 220 2026-09-08 September 37 507 Shift A DS1 128 2.70 0.006549 0.838267 Delete
176 219 2026-09-08 September 37 508 Shift A DS1 200 2.70 0.006549 1.309792 Delete
175 218 2026-09-08 September 37 495 Shift A DS1 196 2.70 0.006549 1.283596 Delete
174 217 2026-09-08 September 37 145 Shift A DS1 120 2.40 0.003181 0.381775 Delete
173 201 2026-09-08 September 37 127 Shift A DS1 201 2.40 0.003181 0.639472 Delete
172 200 2026-09-08 September 37 99 Shift A DS1 196 2.40 0.003181 0.623565 Delete
Menampilkan Halaman 38 dari 53 (Total: 521 data)