Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
283 701 2.40 915.00 1830.00 FJB E1 UTY E 166 (Sisa: 0)
282 333 2.40 915.00 1830.00 FJB E1 UTY E 184 (Sisa: 0)
281 641 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
279 663 2.70 1220.00 2440.00 FA E1 UTY 152 (Sisa: 0)
278 623 2.70 1220.00 2440.00 FA E1 UTY 158 (Sisa: 0)
277 658 2.70 1220.00 2440.00 FA E1 UTY 158 (Sisa: 0)
276 632 2.70 1220.00 2440.00 FA E1 UTY 87 (Sisa: 0)
275 622 2.70 1220.00 2440.00 FA E1 UTY 152 (Sisa: 0)
274 621 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
273 580//538 17.60 1220.00 2440.00 MA B4 G1 39 (Sisa: 0)
Total: 499 data
< Prev Halaman 26 dari 50 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
39 56 2026-09-01 September 36 257 Shift A DS1 31 15.00 0.041675 1.291931 Delete
38 55 2026-09-01 September 36 259 Shift A DS1 48 15.00 0.041675 2.000410 Delete
37 54 2026-09-01 September 36 382 Shift A DS1 22 15.00 0.041675 0.916854 Delete
36 37 2026-09-01 September 36 205 Shift A DS1 55 8.60 0.022809 1.254502 Delete
35 36 2026-09-01 September 36 320 Shift A DS1 33 11.60 0.031813 1.049820 Delete
34 35 2026-09-01 September 36 170//199 Shift A DS1 59 11.60 0.031813 1.876950 Delete
33 34 2026-09-01 September 36 199//319 Shift A DS1 46 11.60 0.031813 1.463385 Delete
32 33 2026-09-01 September 36 170 Shift A DS1 60 11.60 0.031813 1.908763 Delete
31 32 2026-09-01 September 36 305 Shift A DS1 50 15.00 0.041675 2.083760 Delete
30 31 2026-09-01 September 36 279 Shift A DS1 50 15.00 0.041675 2.083760 Delete
Menampilkan Halaman 52 dari 53 (Total: 521 data)