Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
289 518 5.00 1230.00 2440.00 FA E2 CI D2 80 (Sisa: 0)
288 671 5.00 1220.00 2440.00 FA E2 CI D2 86 (Sisa: 0)
287 565//555 14.60 1220.00 2440.00 MA B4 G1 22 (Sisa: 0)
286 677//565 14.60 1220.00 2440.00 MA B4 G1 29 (Sisa: 17)
285 334 2.40 915.00 1830.00 FJB E1 UTY E 200 (Sisa: 0)
284 695 2.40 915.00 1830.00 FJB E1 UTY E 200 (Sisa: 0)
283 701 2.40 915.00 1830.00 FJB E1 UTY E 166 (Sisa: 0)
282 333 2.40 915.00 1830.00 FJB E1 UTY E 184 (Sisa: 0)
281 641 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
279 663 2.70 1220.00 2440.00 FA E1 UTY 152 (Sisa: 0)
Total: 515 data
< Prev Halaman 27 dari 52 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
84 104 2026-09-02 September 36 451/432 Shift A DS1 250 2.40 0.003181 0.795364 Delete
83 103 2026-09-02 September 36 452/451 Shift A DS1 158 2.40 0.003181 0.502670 Delete
82 96 2026-09-02 September 36 50 Shift B DS2 60 11.60 0.017749 1.064950 Delete
81 94 2026-09-02 September 36 407 Shift A DS1 57 11.60 0.017749 1.011703 Delete
80 93 2026-09-02 September 36 387 Shift A DS1 60 11.60 0.017749 1.064950 Delete
79 92 2026-09-02 September 36 381 Shift A DS1 59 11.60 0.017749 1.047201 Delete
78 90 2026-09-02 September 36 359 Shift B DS2 60 11.60 0.017749 1.064950 Delete
77 89 2026-09-02 September 36 375 Shift A DS1 60 11.60 0.017749 1.064950 Delete
76 88 2026-09-02 September 36 8308 Shift A DS1 200 3.70 0.009604 1.920768 Delete
75 87 2026-09-02 September 36 374 Shift A DS1 35 14.60 0.022773 0.797038 Delete
Menampilkan Halaman 49 dari 54 (Total: 536 data)