Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
550 751 2.40 915.00 1830.00 FM E1 UTY E 218 (Sisa: 0)
549 727 2.40 915.00 1830.00 FM E1 UTY E 200 (Sisa: 0)
548 804 2.40 915.00 1830.00 FM E1 UTY E 200 (Sisa: 0)
547 731 2.40 915.00 1830.00 FM E1 UTY E 230 (Sisa: 0)
546 797//796 8.60 915.00 1830.00 MA B4 G1 40 (Sisa: 0)
545 795 8.20 915.00 1830.00 MA B4 G1 79 (Sisa: 0)
544 778//782 2.40 915.00 1830.00 FM E1 UTY E 232 (Sisa: 0)
542 904 2.40 915.00 1830.00 FM E1 UTY E 236 (Sisa: 0)
541 789 2.40 915.00 1830.00 FM E1 UTY E 204 (Sisa: 0)
540 823//821 8.60 1220.00 2440.00 MA B4 G1 72 (Sisa: 0)
Total: 515 data
< Prev Halaman 3 dari 52 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
236 209 2026-09-11 September 37 559 Shift B DS2 41 14.60 0.022773 0.933673 Delete
235 208 2026-09-11 September 37 465 Shift B DS2 47 14.60 0.022773 1.070308 Delete
234 166 2026-09-11 September 37 x Shift B DS2 59 9.00 0.023814 1.405050 Delete
233 165 2026-09-11 September 37 x Shift A DS1 57 9.00 0.023814 1.357421 Delete
232 155 2026-09-11 September 37 x Shift A DS1 79 9.00 0.023814 1.881338 Delete
231 257 2026-09-10 September 37 361 Shift A DS1 31 9.00 0.023814 0.738246 Delete
230 255 2026-09-10 September 37 572 Shift A DS1 50 15.00 0.041675 2.083760 Delete
229 254 2026-09-10 September 37 593 Shift B DS2 49 15.00 0.041675 2.042085 Delete
228 253 2026-09-10 September 37 576 Shift B DS2 50 15.00 0.041675 2.083760 Delete
227 248 2026-09-10 9 37 558 A DS1 36 14.60 0.040484 1.457441 Delete
Menampilkan Halaman 34 dari 54 (Total: 536 data)