Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
550 751 2.40 915.00 1830.00 FM E1 UTY E 218 (Sisa: 0)
549 727 2.40 915.00 1830.00 FM E1 UTY E 200 (Sisa: 0)
548 804 2.40 915.00 1830.00 FM E1 UTY E 200 (Sisa: 0)
547 731 2.40 915.00 1830.00 FM E1 UTY E 230 (Sisa: 0)
546 797//796 8.60 915.00 1830.00 MA B4 G1 40 (Sisa: 0)
545 795 8.20 915.00 1830.00 MA B4 G1 79 (Sisa: 0)
544 778//782 2.40 915.00 1830.00 FM E1 UTY E 232 (Sisa: 0)
542 904 2.40 915.00 1830.00 FM E1 UTY E 236 (Sisa: 0)
541 789 2.40 915.00 1830.00 FM E1 UTY E 204 (Sisa: 0)
540 823//821 8.60 1220.00 2440.00 MA B4 G1 72 (Sisa: 0)
Total: 515 data
< Prev Halaman 3 dari 52 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
144 143 2026-09-07 September 37 967 Shift B DS2 59 11.60 0.031813 1.876950 Delete
143 142 2026-09-07 September 37 347 Shift A DS1 64 11.60 0.031813 2.036014 Delete
142 241 2026-09-05 September 36 522 Shift A DS1 100 5.00 0.011907 1.190720 Delete
141 175 2026-09-05 September 36 x Shift A DS1 73 3.70 0.009526 0.695380 Delete
140 174 2026-09-05 September 36 x Shift A DS1 183 3.70 0.009526 1.743214 Delete
139 152 2026-09-05 September 36 147 Shift A DS1 199 2.40 0.003181 0.633110 Delete
138 151 2026-09-05 September 36 133 Shift A DS1 192 2.40 0.003181 0.610839 Delete
137 150 2026-09-05 September 36 181 Shift A DS2 197 2.40 0.003181 0.626747 Delete
136 149 2026-09-05 September 36 x Shift A DS1 50 9.00 0.023814 1.190720 Delete
135 148 2026-09-05 September 36 448 Shift B DS2 41 11.60 0.017556 0.719785 Delete
Menampilkan Halaman 43 dari 54 (Total: 536 data)