Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
218 495 2.70 1220.00 2440.00 FA E2 CI D2 196 (Sisa: 0)
217 145 2.40 915.00 1830.00 FJB E1 UTY E 120 (Sisa: 0)
216 561 15.00 1220.00 2440.00 FA B4 CI 17 47 (Sisa: 0)
215 592 15.00 1220.00 2440.00 FA B4 CI 17 22 (Sisa: 0)
214 600 15.00 1220.00 2440.00 FM E1 UTY E 50 (Sisa: 0)
213 598 15.00 1220.00 2440.00 FA E2 BB CC 47 (Sisa: 0)
212 599 15.00 1220.00 2440.00 FA E2 BB CC 49 (Sisa: 0)
211 560 14.60 915.00 1830.00 MA B4 G1 42 (Sisa: 0)
210 520 14.60 915.00 1830.00 MA B4 G1 31 (Sisa: 0)
209 559 14.60 915.00 1830.00 MA B4 G1 41 (Sisa: 0)
Total: 515 data
< Prev Halaman 34 dari 52 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
144 143 2026-09-07 September 37 967 Shift B DS2 59 11.60 0.031813 1.876950 Delete
143 142 2026-09-07 September 37 347 Shift A DS1 64 11.60 0.031813 2.036014 Delete
142 241 2026-09-05 September 36 522 Shift A DS1 100 5.00 0.011907 1.190720 Delete
141 175 2026-09-05 September 36 x Shift A DS1 73 3.70 0.009526 0.695380 Delete
140 174 2026-09-05 September 36 x Shift A DS1 183 3.70 0.009526 1.743214 Delete
139 152 2026-09-05 September 36 147 Shift A DS1 199 2.40 0.003181 0.633110 Delete
138 151 2026-09-05 September 36 133 Shift A DS1 192 2.40 0.003181 0.610839 Delete
137 150 2026-09-05 September 36 181 Shift A DS2 197 2.40 0.003181 0.626747 Delete
136 149 2026-09-05 September 36 x Shift A DS1 50 9.00 0.023814 1.190720 Delete
135 148 2026-09-05 September 36 448 Shift B DS2 41 11.60 0.017556 0.719785 Delete
Menampilkan Halaman 43 dari 54 (Total: 536 data)