Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
218 495 2.70 1220.00 2440.00 FA E2 CI D2 196 (Sisa: 0)
217 145 2.40 915.00 1830.00 FJB E1 UTY E 120 (Sisa: 0)
216 561 15.00 1220.00 2440.00 FA B4 CI 17 47 (Sisa: 0)
215 592 15.00 1220.00 2440.00 FA B4 CI 17 22 (Sisa: 0)
214 600 15.00 1220.00 2440.00 FM E1 UTY E 50 (Sisa: 0)
213 598 15.00 1220.00 2440.00 FA E2 BB CC 47 (Sisa: 0)
212 599 15.00 1220.00 2440.00 FA E2 BB CC 49 (Sisa: 0)
211 560 14.60 915.00 1830.00 MA B4 G1 42 (Sisa: 0)
210 520 14.60 915.00 1830.00 MA B4 G1 31 (Sisa: 0)
209 559 14.60 915.00 1830.00 MA B4 G1 41 (Sisa: 0)
Total: 515 data
< Prev Halaman 34 dari 52 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
124 127 2026-09-05 September 36 460 Shift B DS2 170 2.40 0.003181 0.540847 Delete
123 126 2026-09-05 September 36 330 Shift A DS1 79 9.00 0.023814 1.881338 Delete
122 102 2026-09-05 September 36 999 Shift A DS1 100 6.00 0.014884 1.488400 Delete
121 95 2026-09-05 September 36 230 Shift A DS1 28 18.00 0.050606 1.416957 Delete
120 82 2026-09-05 September 36 230 Shift A DS1 30 18.00 0.050606 1.518168 Delete
119 29 2026-09-05 September 36 23 Shift B DS2 30 18.00 0.050606 1.518168 Delete
118 144 2026-09-04 September 36 370//470 Shift A DS1 174 2.70 0.003684 0.640979 Delete
117 141 2026-09-04 September 36 418 Shift A DS1 164 2.70 0.003684 0.604142 Delete
116 140 2026-09-04 September 36 428 Shift A DS1 164 2.70 0.003684 0.604142 Delete
115 139 2026-09-04 September 36 481 Shift A DS1 164 2.70 0.003684 0.604142 Delete
Menampilkan Halaman 45 dari 54 (Total: 536 data)