Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
202 221//456 18.00 1220.00 2440.00 FM E1 UTY E 33 (Sisa: 0)
201 127 2.40 915.00 1830.00 FJB E1 UTY E 201 (Sisa: 0)
200 99 2.40 915.00 1830.00 FJB E1 UTY E 196 (Sisa: 0)
199 440//410 2.40 915.00 1830.00 FJB E1 UTY E 256 (Sisa: 0)
198 450//440 2.40 915.00 1830.00 FJB E1 UTY E 178 (Sisa: 0)
197 128 2.40 915.00 1830.00 FJB E1 UTY E 94 (Sisa: 0)
196 535//534 15.00 1220.00 2440.00 FA B4 CI 17 40 (Sisa: 0)
195 420//478 15.00 1220.00 2440.00 FA B4 CI 17 50 (Sisa: 0)
194 478//471 15.00 1220.00 2440.00 FA B4 CI 17 50 (Sisa: 0)
193 x 15.00 1220.00 2440.00 FA B4 BB CC LU DRI P 11 (Sisa: 11)
Total: 499 data
< Prev Halaman 34 dari 50 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
69 68 2026-09-02 September 36 349 Shift B DS2 61 11.60 0.031813 1.940576 Delete
68 62 2026-09-02 September 36 355 Shift A DS1 60 11.60 0.017846 1.070770 Delete
67 61 2026-09-02 September 36 357 Shift A DS1 60 11.60 0.017846 1.070770 Delete
66 60 2026-09-02 September 36 356 Shift A DS1 59 11.60 0.017846 1.052923 Delete
65 59 2026-09-02 September 36 359 Shift A DS1 44 11.60 0.017846 0.785231 Delete
64 58 2026-09-02 9 36 8309 B DS2 197 3.70 0.009526 1.876575 Delete
63 57 2026-09-02 September 36 8349 Shift A DS1 198 3.70 0.009526 1.886100 Delete
62 51 2026-09-02 September 36 251/237 Shift B DS2 33 14.60 0.022897 0.755600 Delete
61 49 2026-09-02 September 36 231 Shift A DS1 41 14.60 0.022897 0.938775 Delete
60 48 2026-09-02 September 36 371 Shift A DS1 50 14.60 0.022897 1.144848 Delete
Menampilkan Halaman 49 dari 53 (Total: 521 data)