Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
202 221//456 18.00 1220.00 2440.00 FM E1 UTY E 33 (Sisa: 0)
201 127 2.40 915.00 1830.00 FJB E1 UTY E 201 (Sisa: 0)
200 99 2.40 915.00 1830.00 FJB E1 UTY E 196 (Sisa: 0)
199 440//410 2.40 915.00 1830.00 FJB E1 UTY E 256 (Sisa: 0)
198 450//440 2.40 915.00 1830.00 FJB E1 UTY E 178 (Sisa: 0)
197 128 2.40 915.00 1830.00 FJB E1 UTY E 94 (Sisa: 0)
196 535//534 15.00 1220.00 2440.00 FA B4 CI 17 40 (Sisa: 0)
195 420//478 15.00 1220.00 2440.00 FA B4 CI 17 50 (Sisa: 0)
194 478//471 15.00 1220.00 2440.00 FA B4 CI 17 50 (Sisa: 0)
193 x 15.00 1220.00 2440.00 FA B4 BB CC LU DRI P 11 (Sisa: 11)
Total: 499 data
< Prev Halaman 34 dari 50 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
59 47 2026-09-02 September 36 297+368 Shift A DS2 45 14.60 0.022897 1.030363 Delete
58 46 2026-09-02 September 36 372 Shift A DS1 50 14.60 0.022897 1.144848 Delete
57 45 2026-09-02 September 36 251 Shift A DS1 49 14.60 0.022897 1.121951 Delete
56 44 2026-09-02 September 36 364 Shift B DS2 40 14.60 0.022897 0.915878 Delete
55 43 2026-09-02 September 36 373 Shift B DS2 50 14.60 0.022897 1.144848 Delete
54 42 2026-09-02 9 36 298 A DS1 52 14.60 0.022897 1.190642 Delete
53 40 2026-09-02 September 36 x Shift A DS1 160 2.40 0.003181 0.509033 Delete
52 38 2026-09-02 September 36 298 Shift B DS2 50 14.60 0.040816 2.040816 Delete
51 168 2026-09-01 September 36 420//x Shift A DS1 28 15.00 0.041675 1.166906 Delete
50 123 2026-09-01 September 36 336 Shift A DS1 196 2.70 0.003684 0.722023 Delete
Menampilkan Halaman 50 dari 53 (Total: 521 data)