Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
192 x 15.00 1220.00 2440.00 FA B4 BB CC LU DRI P 6 (Sisa: 0)
191 x 15.00 1220.00 2440.00 FA B4 BB CC LU DRI P 21 (Sisa: 21)
190 x 9.00 1220.00 2440.00 FA B4 BB CC LU DRI P 17 (Sisa: 17)
189 x 8.60 1230.00 2440.00 MA B4 LU DRI PTS P1+ 20 (Sisa: 1)
188 x 8.60 1230.00 2440.00 MA B4 LU DRI PTS P1+ 16 (Sisa: 0)
187 518 5.00 1220.00 2440.00 FA E2 CI D2 98 (Sisa: 0)
186 542 5.00 1220.00 2440.00 FA E2 CI D2 90 (Sisa: 0)
185 503 5.00 1220.00 2440.00 FA E2 CI D2 100 (Sisa: 0)
184 502 5.00 1220.00 2440.00 FA E2 CI D2 96 (Sisa: 0)
183 534 15.00 1220.00 2440.00 FA B4 CI 17 31 (Sisa: 0)
Total: 499 data
< Prev Halaman 35 dari 50 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
99 110 2026-09-03 September 36 378 Shift A DS1 30 20.50 0.058048 1.741428 Delete
98 98 2026-09-03 September 36 423 Shift A DS1 59 11.60 0.017749 1.047201 Delete
97 97 2026-09-03 9 36 391 A DS1 62 11.60 0.017749 1.100449 Delete
96 91 2026-09-03 September 36 386 Shift A DS1 60 11.60 0.017749 1.064950 Delete
95 86 2026-09-03 September 36 328 Shift A DS1 40 17.60 0.049820 1.992797 Delete
94 85 2026-09-03 September 36 409//329 Shift A DS1 35 17.60 0.049820 1.743697 Delete
93 41 2026-09-03 September 36 353/352 Shift B DS2 23 17.60 0.049820 1.145858 Delete
92 39 2026-09-03 September 36 8383 Shift A DS1 101 3.70 0.009604 0.969988 Delete
91 263 2026-09-02 September 36 x Shift A DS1 12 14.60 0.022773 0.273270 Delete
90 122 2026-09-02 September 36 x Shift A DS1 197 3.70 0.009604 1.891956 Delete
Menampilkan Halaman 46 dari 53 (Total: 521 data)