Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
178 x 11.60 920.00 1830.00 MA B4 G1 51 (Sisa: 0)
177 x 11.60 920.00 1830.00 MA B4 G1 39 (Sisa: 0)
176 422 11.60 920.00 1830.00 MA B4 G1 29 (Sisa: 0)
175 x 3.70 1220.00 2440.00 FM B4 G1 73 (Sisa: 0)
174 x 3.70 1220.00 2440.00 FM B4 G1 183 (Sisa: 0)
173 476 15.00 1220.00 2440.00 FA B4 CI 17 31 (Sisa: 0)
172 471 15.00 1220.00 2440.00 FA B4 CI 17 43 (Sisa: 0)
171 476//478 15.00 1220.00 2440.00 FA B4 CI 17 35 (Sisa: 0)
170 420 15.00 1220.00 2440.00 FA B4 CI 17 28 (Sisa: 0)
169 231 3.00 1220.00 2440.00 FA B4 BB CC 190 (Sisa: 0)
Total: 515 data
< Prev Halaman 38 dari 52 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
176 219 2026-09-08 September 37 508 Shift A DS1 200 2.70 0.006549 1.309792 Delete
175 218 2026-09-08 September 37 495 Shift A DS1 196 2.70 0.006549 1.283596 Delete
174 217 2026-09-08 September 37 145 Shift A DS1 120 2.40 0.003181 0.381775 Delete
173 201 2026-09-08 September 37 127 Shift A DS1 201 2.40 0.003181 0.639472 Delete
172 200 2026-09-08 September 37 99 Shift A DS1 196 2.40 0.003181 0.623565 Delete
171 199 2026-09-08 September 37 440//410 Shift A DS1 256 2.40 0.003181 0.814452 Delete
170 198 2026-09-08 September 37 450//440 Shift A DS1 178 2.40 0.003181 0.566299 Delete
169 197 2026-09-08 September 37 128 Shift A DS1 94 2.40 0.003181 0.299057 Delete
168 196 2026-09-08 September 37 535//534 Shift A DS1 40 15.00 0.041675 1.667008 Delete
167 187 2026-09-08 September 37 518 Shift A DS1 98 5.00 0.011907 1.166906 Delete
Menampilkan Halaman 40 dari 54 (Total: 536 data)