Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
108 263/210 2.40 915.00 1830.00 FJB E1 UTY E 149 (Sisa: 0)
107 263/x 2.40 915.00 1830.00 FJB E1 UTY E 176 (Sisa: 0)
106 317/x 2.40 915.00 1830.00 FJB E1 UTY E 157 (Sisa: 93)
105 431 2.40 915.00 1830.00 FJB E1 UTY E 85 (Sisa: 0)
104 451/432 2.40 915.00 1830.00 FJB E1 UTY E 250 (Sisa: 0)
103 452/451 2.40 915.00 1830.00 FJB E1 UTY E 158 (Sisa: 0)
102 999 6.00 1220.00 2440.00 FA E2 BB CC 100 (Sisa: 0)
101 408 11.60 915.00 1830.00 MA B4 G1 60 (Sisa: 0)
100 403 11.60 915.00 1830.00 FA B4 G2 60 (Sisa: 0)
99 402 11.60 915.00 1830.00 FA B4 G2 60 (Sisa: 0)
Total: 515 data
< Prev Halaman 45 dari 52 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
186 240 2026-09-08 September 37 596 Shift B DS2 196 2.70 0.006549 1.283596 Delete
185 234 2026-09-08 September 37 595 Shift A DS1 200 2.70 0.006549 1.309792 Delete
184 233 2026-09-08 September 37 608 Shift B DS2 196 2.70 0.006549 1.283596 Delete
183 232 2026-09-08 September 37 531 Shift A DS1 212 2.70 0.006549 1.388380 Delete
182 231 2026-09-08 September 37 603 Shift B DS2 192 2.70 0.006549 1.257400 Delete
181 224 2026-09-08 September 37 582 Shift A DS1 200 2.70 0.006549 1.309792 Delete
180 224 2026-09-08 September 37 582 Shift A DS1 200 2.70 0.006549 1.309792 Delete
179 222 2026-09-08 September 37 545 Shift A DS1 38 15.00 0.041675 1.583658 Delete
178 221 2026-09-08 September 37 577 Shift A DS1 44 15.00 0.041675 1.833709 Delete
177 220 2026-09-08 September 37 507 Shift A DS1 128 2.70 0.006549 0.838267 Delete
Menampilkan Halaman 39 dari 54 (Total: 536 data)