Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
519 x 9.00 1220.00 2440.00 FA E1 UTY 28 (Sisa: 0)
518 705 11.60 915.00 1830.00 FA B4 G2 43 (Sisa: 0)
517 788 2.40 915.00 1830.00 FM E1 UTY E 193 (Sisa: 0)
516 844 11.60 915.00 1830.00 FA B4 G2 60 (Sisa: 0)
515 792 11.60 915.00 2440.00 FA B4 G2 40 (Sisa: 0)
514 794 11.60 915.00 1830.00 FA B4 G2 60 (Sisa: 0)
512 845 11.60 915.00 1830.00 FA B4 G2 60 (Sisa: 0)
511 670 11.60 915.00 1830.00 FA B4 CI 17 G2 60 (Sisa: 0)
510 705//759 11.60 915.00 1830.00 FA B4 G2 40 (Sisa: 0)
509 847 11.60 915.00 1830.00 FA B4 G2 59 (Sisa: 0)
Total: 515 data
< Prev Halaman 6 dari 52 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
176 219 2026-09-08 September 37 508 Shift A DS1 200 2.70 0.006549 1.309792 Delete
175 218 2026-09-08 September 37 495 Shift A DS1 196 2.70 0.006549 1.283596 Delete
174 217 2026-09-08 September 37 145 Shift A DS1 120 2.40 0.003181 0.381775 Delete
173 201 2026-09-08 September 37 127 Shift A DS1 201 2.40 0.003181 0.639472 Delete
172 200 2026-09-08 September 37 99 Shift A DS1 196 2.40 0.003181 0.623565 Delete
171 199 2026-09-08 September 37 440//410 Shift A DS1 256 2.40 0.003181 0.814452 Delete
170 198 2026-09-08 September 37 450//440 Shift A DS1 178 2.40 0.003181 0.566299 Delete
169 197 2026-09-08 September 37 128 Shift A DS1 94 2.40 0.003181 0.299057 Delete
168 196 2026-09-08 September 37 535//534 Shift A DS1 40 15.00 0.041675 1.667008 Delete
167 187 2026-09-08 September 37 518 Shift A DS1 98 5.00 0.011907 1.166906 Delete
Menampilkan Halaman 40 dari 54 (Total: 536 data)