Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Dempul P2

Daftar referensi data Dempul P2

Reset
ID Dempul P2 No. Pallet Tebal Lebar Panjang Grade Jumlah (Sisa) Aksi
469 x 2.70 1220.00 2440.00 FA E1 UTY 200 (Sisa: 0)
468 774//786 15.00 1220.00 2440.00 FA B4 CI 17 48 (Sisa: 0)
466 734 14.60 915.00 1830.00 MA B4 G1 37 (Sisa: 0)
465 766 14.60 915.00 1830.00 MA B4 G1 34 (Sisa: 0)
464 725//722 14.60 915.00 1830.00 MA B4 G1 42 (Sisa: 0)
463 243 5.00 915.00 1830.00 FM E2 CI 17 53 (Sisa: 0)
462 662 5.00 915.00 1830.00 FM E2 LKL C11 7 46 (Sisa: 0)
460 816 2.70 1220.00 2440.00 FA E1 UTY 258 (Sisa: 0)
459 461 15.00 1220.00 2440.00 FA B4 BB CC 43 (Sisa: 0)
458 799 15.00 1220.00 2440.00 FA B4 CI 17 50 (Sisa: 0)
Total: 505 data
< Prev Halaman 9 dari 51 Next >

Form Input Data Sanding P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Dempul_P2
2. Input Data Sanding_P2

Daftar Hasil Input Data Sanding P2

Rekapitulasi data yang telah berhasil disimpan

ID Sanding ID Dempul P2 Tanggal Bulan Minggu No Pallet Shift No Mesin Jumlah Sanding Tebal M³/PCS TOT P2 M³ Aksi
166 186 2026-09-08 September 37 542 Shift B DS2 90 5.00 0.011907 1.071648 Delete
165 185 2026-09-08 September 37 503 Shift B DS2 100 5.00 0.011907 1.190720 Delete
164 184 2026-09-08 September 37 502 Shift B DS2 96 5.00 0.011907 1.143091 Delete
163 183 2026-09-08 September 37 534 Shift A DS1 31 15.00 0.041675 1.291931 Delete
162 182 2026-09-08 September 37 325 Shift A DS1 80 9.00 0.023814 1.905152 Delete
161 180 2026-09-08 September 37 864 Shift A DS1 59 9.00 0.023814 1.405050 Delete
160 161 2026-09-08 9 37 546 A DS1 38 15.00 0.041675 1.583658 Delete
159 120 2026-09-08 September 37 968 Shift A DS1 80 9.00 0.023814 1.905152 Delete
158 119 2026-09-08 September 37 961 Shift A DS1 68 9.00 0.023814 1.619379 Delete
157 118 2026-09-08 September 37 331 Shift A DS1 76 9.00 0.023814 1.809894 Delete
Menampilkan Halaman 40 dari 53 (Total: 526 data)