Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
482 861//705 11.60 915.00 1830.00 FA B4 G2 41 / 59
481 719//718 11.60 915.00 1830.00 FA B4 G2 61 / 61
480 772 2.40 915.00 1830.00 FM E1 UTY E 169 / 200
479 846 11.60 915.00 1830.00 FA B4 G2 0 / 52
478 802 11.60 915.00 1830.00 FA B4 G2 0 / 49
477 756 5.00 915.00 1830.00 FM E2 UTY B(1xP) 35 / 84
476 680 11.60 915.00 1830.00 FA B4 G2 64 / 64
475 805 2.40 915.00 1830.00 FM E1 UTY E 200 / 200
474 x 18.00 1220.00 2440.00 FA E1 UTY 32 / 32
473 679 11.60 915.00 1830.00 FA B4 G2 41 / 41
Total: 536 data
< Prev Halaman 10 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
477 299 2026-09-14 M:9 / W:38 617 Shift A P2.CU.2 11.60 x 915.00 x 1830.00 FA B4 G2 20 P:0 / B:20 O:0 / B:34 0.017749 0.354983 Del
476 414 2026-09-14 M:9 / W:38 638 Shift A P2.CU.1 18.00 x 1220.00 x 2440.00 FA B4 BB CC 34 P:1 / B:33 O:0 / B:0 0.050606 1.720590 Del
475 413 2026-09-14 M:9 / W:38 588 Shift A P2.CU.3 18.00 x 1220.00 x 2440.00 FA B4 BB CC 35 P:0 / B:35 O:0 / B:0 0.050606 1.771196 Del
473 411 2026-09-14 M:9 / W:38 613 Shift B P2.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:0 / B:60 O:0 / B:0 0.017749 1.064950 Del
471 409 2026-09-14 M:9 / W:38 661 Shift B P2.CU.1 11.60 x 1220.00 x 2440.00 MA B4 G1 45 P:2 / B:43 O:0 / B:0 0.031554 1.419934 Del
470 408 2026-09-14 M:9 / W:38 652 Shift B P2.CU.2 11.60 x 1220.00 x 2440.00 MA B4 G1 48 P:8 / B:40 O:0 / B:0 0.031554 1.514596 Del
467 406 2026-09-14 M:9 / W:38 668 Shift B P2.CU.2 18.00 x 1220.00 x 2440.00 FA B4 BB CC 41 P:0 / B:41 O:0 / B:0 0.050606 2.074830 Del
466 405 2026-09-14 M:9 / W:38 509 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 24 P:0 / B:24 O:0 / B:176 0.006549 0.157175 Del
465 299 2026-09-14 M:9 / W:38 617 Shift A P2.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 34 P:0 / B:34 O:0 / B:20 0.017749 0.603472 Del
464 300 2026-09-14 M:9 / W:38 686 Shift A P2.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 37 P:1 / B:36 O:0 / B:0 0.017749 0.656719 Del