Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
447 536 20.50 1220.00 2440.00 MA B4 G1 0 / 21
446 536 20.50 1220.00 2440.00 MA B4 G1 0 / 19
445 701//347 20.50 1220.00 2440.00 MA B4 G1 0 / 21
444 682//697 20.50 1220.00 2440.00 MA B4 G1 0 / 24
443 682 20.50 1220.00 2440.00 MA B4 G1 0 / 23
442 733 5.00 1220.00 2440.00 FA E2 CI D2 0 / 100
441 545 15.00 1220.00 2440.00 FA B4 BB CC 0 / 48
440 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 196
439 656 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
438 657 2.70 1220.00 2440.00 FA E1 UTY 0 / 184

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
659 679 2026-09-18 M:9 / W:38 921//881 Shift B P1.CU.3 14.60 x 915.00 x 1830.00 MA B4 G1 51 P:0 / B:51 O:51 / B:0 0.022773 1.161399 Del
658 678 2026-09-18 M:9 / W:38 879 Shift B P1.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:50 / B:0 0.022773 1.138626 Del
657 676 2026-09-18 M:9 / W:38 x Shift B P1.CU.2 3.40 x 1220.00 x 2440.00 FM B4 BB CC 200 P:17 / B:183 O:182 / B:1 0.008633 1.726544 Del
656 677 2026-09-18 M:9 / W:38 x Shift B P1.CU.4 3.40 x 1220.00 x 2440.00 FM B4 BB CC 200 P:3 / B:197 O:197 / B:0 0.008633 1.726544 Del
655 675 2026-09-18 M:9 / W:38 913 Shift B P1.CU.3 14.60 x 915.00 x 1830.00 MA B4 G1 39 P:0 / B:39 O:39 / B:0 0.022773 0.888128 Del
654 672 2026-09-18 M:9 / W:38 734//850 Shift B P1.CU.3 14.60 x 915.00 x 1830.00 MA B4 G1 50 P:6 / B:44 O:44 / B:0 0.022773 1.138626 Del
653 667 2026-09-18 M:9 / W:38 906//878 Shift B P1.CU.5 14.60 x 915.00 x 1830.00 MA B4 G1 50 P:14 / B:36 O:36 / B:0 0.022773 1.138626 Del
652 664 2026-09-18 M:9 / W:38 906 Shift B P1.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:50 / B:0 0.022773 1.138626 Del
651 657 2026-09-18 M:9 / W:38 930 Shift A P1.CU.1 18.00 x 915.00 x 1830.00 FM E2 CI 17 43 P:2 / B:41 O:0 / B:41 0.028466 1.224023 Del
650 656 2026-09-18 M:9 / W:38 894//890 Shift A P1.CU.6 8.60 x 1220.00 x 2440.00 MA B4 G1 80 P:0 / B:80 O:80 / B:0 0.022624 1.809894 Del