Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
500 604 11.60 915.00 1830.00 FA B4 G2 60 / 60
498 x 11.60 915.00 1830.00 FA B4 G2 0 / 15
496 842 11.60 915.00 1830.00 FA B4 G2 62 / 62
495 860 11.60 915.00 1830.00 FA B4 G2 0 / 59
494 843 11.60 915.00 1830.00 FA B4 G2 0 / 65
493 818 11.60 915.00 1830.00 FA B4 G2 0 / 60
491 723 11.60 915.00 1830.00 FA B4 G2 0 / 35
490 807 11.60 915.00 1830.00 FA B4 G2 59 / 59
489 742 5.00 915.00 1830.00 FM E2 UTY B(1xP) 86 / 86
488 832 11.60 915.00 1830.00 FA B4 G2 55 / 55
Total: 521 data
< Prev Halaman 7 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
466 405 2026-09-14 M:9 / W:38 509 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 24 P:0 / B:24 O:0 / B:176 0.006549 0.157175 Del
465 299 2026-09-14 M:9 / W:38 617 Shift A P2.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 34 P:0 / B:34 O:0 / B:20 0.017749 0.603472 Del
464 300 2026-09-14 M:9 / W:38 686 Shift A P2.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 37 P:1 / B:36 O:0 / B:0 0.017749 0.656719 Del
463 298 2026-09-14 M:9 / W:38 616 Shift A P2.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 42 P:0 / B:42 O:0 / B:0 0.017749 0.745465 Del
462 380 2026-09-14 M:9 / W:38 583 Shift A P2.CU.1 11.20 x 1220.00 x 2440.00 FM E1 BB CC 37 P:5 / B:32 O:0 / B:3 0.030363 1.123444 Del
458 304 2026-09-12 M:9 / W:37 733 Shift A P2.CU.1 5.00 x 1220.00 x 2440.00 FA E2 CI D2 99 P:1 / B:98 O:0 / B:0 0.011907 1.178813 Del
457 231 2026-09-12 M:9 / W:37 361 Shift A P2.CU.3 9.00 x 1220.00 x 2440.00 FA E2 CI D2 31 P:0 / B:31 O:0 / B:0 0.023814 0.738246 Del
455 258 2026-09-12 M:9 / W:37 334 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:18 / B:182 O:0 / B:0 0.003181 0.636291 Del
454 257 2026-09-12 M:9 / W:37 695 Shift B P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 200 P:4 / B:196 O:0 / B:0 0.003181 0.636291 Del
452 206 2026-09-11 M:9 / W:37 x Shift A P2.CU.2 3.00 x 1220.00 x 2440.00 FA B4 BB CC 138 P:46 / B:92 O:0 / B:52 0.007442 1.026996 Del