Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
134 423 11.60 915.00 1830.00 FA B4 G2 0 / 59
133 391 11.60 915.00 1830.00 FA B4 G2 0 / 62
132 818 20.50 915.00 1830.00 MA B4 G1 0 / 20
131 804 20.50 915.00 1830.00 MA B4 G1 0 / 30
130 359 11.60 915.00 1830.00 MA B4 G1 0 / 60
129 381 11.60 915.00 1830.00 MA B4 G1 0 / 60
128 408 11.60 915.00 1830.00 MA B4 G1 0 / 60
127 407 11.60 915.00 1830.00 MA B4 G1 0 / 60
126 386 11.60 915.00 1830.00 MA B4 G1 0 / 60
125 387 11.60 915.00 1830.00 MA B4 G1 0 / 60

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
625 546 2026-09-17 M:9 / W:38 681//679 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 59 P:0 / B:59 O:115 / B:-56 0.017749 1.047201 Del
624 551 2026-09-17 M:9 / W:38 833 Shift A P1.CU.2 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:0 / B:60 O:114 / B:-54 0.017749 1.064950 Del
623 549 2026-09-17 M:9 / W:38 835 Shift A P1.CU.2 11.60 x 915.00 x 1830.00 FA B4 G2 49 P:0 / B:49 O:94 / B:-45 0.017749 0.869709 Del
622 555 2026-09-17 M:9 / W:38 860 Shift B P1.CU.3 11.60 x 915.00 x 1830.00 FA B4 G2 59 P:0 / B:59 O:118 / B:-59 0.017749 1.047201 Del
621 556 2026-09-17 M:9 / W:38 818 Shift B P1.CU.3 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:0 / B:60 O:120 / B:-60 0.017749 1.064950 Del
620 553 2026-09-17 M:9 / W:38 844 Shift B P1.CU.4 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:0 / B:60 O:113 / B:-53 0.017749 1.064950 Del
619 646 2026-09-17 M:9 / W:38 845 Shift B P1.CU.2 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:0 / B:60 O:120 / B:-60 0.017749 1.064950 Del
618 642 2026-09-17 M:9 / W:38 908 Shift B P1.CU.2 15.00 x 1220.00 x 2440.00 FA B4 BB CC 50 P:0 / B:50 O:100 / B:-50 0.041675 2.083760 Del
617 632 2026-09-17 M:9 / W:38 583 Shift B P1.CU.2 11.20 x 1220.00 x 2440.00 FM E1 BB CC 40 P:0 / B:40 O:80 / B:-40 0.030363 1.214534 Del
616 631 2026-09-17 M:9 / W:38 732 Shift B P1.CU.3 11.20 x 1220.00 x 2440.00 FM E1 BB CC 43 P:0 / B:43 O:43 / B:0 0.030363 1.305624 Del