Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
455 734 14.60 915.00 1830.00 MA B4 G1 37 / 37
454 766 14.60 915.00 1830.00 MA B4 G1 0 / 34
453 725//722 14.60 915.00 1830.00 MA B4 G1 42 / 42
452 243 5.00 915.00 1830.00 FM E2 CI 17 53 / 53
451 662 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 46
450 838 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
449 816 2.70 1220.00 2440.00 FA E1 UTY 0 / 258
448 461 15.00 1220.00 2440.00 FA B4 BB CC 43 / 43
447 799 15.00 1220.00 2440.00 FA B4 CI 17 44 / 50
446 827 2.40 1220.00 2440.00 FA E1 UTY E 0 / 242
Total: 521 data
< Prev Halaman 11 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
445 296 2026-09-12 M:9 / W:37 618 Shift A P2.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 66 P:1 / B:65 O:0 / B:0 0.011907 0.785875 Del
444 268 2026-09-12 M:9 / W:37 615 Shift A P2.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 58 P:0 / B:58 O:0 / B:0 0.011907 0.690618 Del
442 403 2026-09-12 M:9 / W:37 563 Shift B P2.CU.4 5.00 x 1220.00 x 2440.00 FA E2 CI D2 104 P:0 / B:104 O:0 / B:0 0.011907 1.238349 Del
441 402 2026-09-12 M:9 / W:37 x Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 106 P:20 / B:86 O:0 / B:82 0.006549 0.694190 Del
440 272 2026-09-12 M:9 / W:37 659 Shift A P2.CU.3 2.70 x 1220.00 x 2440.00 FA E1 UTY 146 P:4 / B:142 O:0 / B:0 0.006549 0.956148 Del
439 206 2026-09-12 M:9 / W:37 x Shift B P2.CU.1 3.00 x 1220.00 x 2440.00 FA B4 BB CC 10 P:0 / B:10 O:0 / B:180 0.007442 0.074420 Del
438 191 2026-09-12 M:9 / W:37 231 Shift A P2.CU.1 3.00 x 1220.00 x 2440.00 FA B4 BB CC 196 P:14 / B:182 O:0 / B:0 0.007442 1.458632 Del
437 190 2026-09-12 M:9 / W:37 x Shift B P2.CU.2 3.00 x 1220.00 x 2440.00 FA B4 BB CC 170 P:22 / B:148 O:0 / B:0 0.007442 1.265140 Del
436 260 2026-09-12 M:9 / W:37 656 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 192 P:32 / B:160 O:0 / B:0 0.006549 1.257400 Del
435 259 2026-09-12 M:9 / W:37 657 Shift B P2.CU.3 2.70 x 1220.00 x 2440.00 FA E1 UTY 184 P:4 / B:180 O:0 / B:0 0.006549 1.205009 Del