Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
477 756 5.00 915.00 1830.00 FM E2 UTY B(1xP) 35 / 84
476 680 11.60 915.00 1830.00 FA B4 G2 64 / 64
475 805 2.40 915.00 1830.00 FM E1 UTY E 200 / 200
474 x 18.00 1220.00 2440.00 FA E1 UTY 32 / 32
473 679 11.60 915.00 1830.00 FA B4 G2 41 / 41
472 752 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
471 790 2.40 915.00 1830.00 FM E1 UTY E 200 / 200
470 870 11.60 915.00 1830.00 FA B4 G2 36 / 36
468 833 11.60 915.00 1830.00 FA B4 G2 60 / 60
467 745 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
Total: 521 data
< Prev Halaman 9 dari 53 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
437 190 2026-09-12 M:9 / W:37 x Shift B P2.CU.2 3.00 x 1220.00 x 2440.00 FA B4 BB CC 170 P:22 / B:148 O:0 / B:0 0.007442 1.265140 Del
436 260 2026-09-12 M:9 / W:37 656 Shift B P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 192 P:32 / B:160 O:0 / B:0 0.006549 1.257400 Del
435 259 2026-09-12 M:9 / W:37 657 Shift B P2.CU.3 2.70 x 1220.00 x 2440.00 FA E1 UTY 184 P:4 / B:180 O:0 / B:0 0.006549 1.205009 Del
434 262 2026-09-12 M:9 / W:37 716 Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 174 P:29 / B:145 O:0 / B:0 0.006549 1.139519 Del
433 402 2026-09-12 M:9 / W:37 x Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 82 P:68 / B:14 O:0 / B:106 0.006549 0.537015 Del
432 156 2026-09-12 M:9 / W:37 671 Shift A P2.CU.3 5.00 x 1220.00 x 2440.00 FA E2 CI D2 86 P:1 / B:85 O:0 / B:0 0.011907 1.024019 Del
431 271 2026-09-11 M:9 / W:37 518 Shift A P2.CU.3 5.00 x 1230.00 x 2440.00 FA E2 CI D2 80 P:2 / B:78 O:0 / B:0 0.012005 0.960384 Del
430 266 2026-09-12 M:9 / W:37 606 Shift A P2.CU.3 5.00 x 1220.00 x 2440.00 FA E2 CI D2 43 P:5 / B:38 O:0 / B:54 0.011907 0.512010 Del
429 401 2026-09-12 M:9 / W:37 647 Shift A P2.CU.3 2.70 x 1220.00 x 2440.00 FA E1 UTY 196 P:11 / B:185 O:0 / B:0 0.006549 1.283596 Del
428 250 2026-09-11 M:9 / W:37 658 Shift A P2.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 158 P:9 / B:149 O:0 / B:0 0.006549 1.034736 Del