Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 268 | 484 | 9.00 | 1220.00 | 2440.00 | FA E2 LKL UTY KRUING | 0 / 80 | |
| 267 | 325 | 9.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 80 | |
| 266 | 542 | 5.00 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 100 | |
| 265 | 502 | 5.00 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 100 | |
| 264 | 503 | 5.00 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 100 | |
| 263 | x | 20.50 | 1230.00 | 2440.00 | MA B4 LU DRI PTS P1+ | 0 / 2 | |
| 262 | x | 15.00 | 1220.00 | 2440.00 | FA B4 BB CC LU DRI P | 0 / 6 | |
| 261 | x | 8.60 | 1230.00 | 2440.00 | MA B4 LU DRI PTS P1+ | 0 / 16 | |
| 260 | x | 15.00 | 1220.00 | 2440.00 | FA B4 BB CC LU DRI P | 0 / 21 | |
| 259 | x | 17.60 | 1220.00 | 2440.00 | FA B4 BB CC LU DRI P | 0 / 23 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 610 | 614 | 2026-09-17 | M:9 / W:38 | 849//848 | Shift B | P1.CU.2 | 14.60 x 915.00 x 1830.00 | MA B4 G1 | 61 | P:1 / B:60 | O:120 / B:-60 | 0.022773 | 1.389124 | Del |
| 609 | 639 | 2026-09-17 | M:9 / W:38 | 815//785 | Shift B | P1.CU.3 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 237 | P:6 / B:231 | O:270 / B:-39 | 0.003181 | 0.754005 | Del |
| 608 | 638 | 2026-09-17 | M:9 / W:38 | 782//779 | Shift B | P1.CU.3 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 286 | P:0 / B:286 | O:568 / B:-282 | 0.003181 | 0.909896 | Del |
| 607 | 635 | 2026-09-17 | M:9 / W:38 | 751 | Shift B | P1.CU.3 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 222 | P:4 / B:218 | O:436 / B:-218 | 0.003181 | 0.706283 | Del |
| 606 | 634 | 2026-09-17 | M:9 / W:38 | 904//757 | Shift B | P1.CU.2 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 260 | P:3 / B:257 | O:497 / B:-240 | 0.003181 | 0.827178 | Del |
| 605 | 633 | 2026-09-17 | M:9 / W:38 | 904 | Shift B | P1.CU.2 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 240 | P:4 / B:236 | O:456 / B:-220 | 0.003181 | 0.763549 | Del |
| 604 | 629 | 2026-09-17 | M:9 / W:38 | 871 | Shift A | P1.CU.3 | 11.60 x 915.00 x 1830.00 | FA B4 G2 | 10 | P:0 / B:10 | O:20 / B:-10 | 0.017749 | 0.177492 | Del |
| 602 | 605 | 2026-09-17 | M:9 / W:38 | 604 | Shift A | P1.CU.1 | 11.60 x 915.00 x 1830.00 | FA B4 G2 | 60 | P:0 / B:60 | O:80 / B:-20 | 0.017749 | 1.064950 | Del |
| 601 | 644 | 2026-09-23 | M:9 / W:39 | x | Shift A | P1.CU.2 | 11.60 x 915.00 x 1830.00 | FA B4 G2 | 15 | P:0 / B:15 | O:30 / B:-15 | 0.017749 | 0.266238 | Del |
| 600 | 604 | 2026-09-17 | M:9 / W:38 | 723 | Shift A | P1.CU.2 | 11.60 x 915.00 x 1830.00 | FA B4 G2 | 35 | P:0 / B:35 | O:70 / B:-35 | 0.017749 | 0.621221 | Del |