Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
84 x 2.40 915.00 1830.00 FJB E1 UTY E 0 / 160
83 345 11.60 1230.00 2440.00 FA B4 G2 0 / 21
82 342 11.60 1230.00 2440.00 FA B4 G2 0 / 50
81 341 11.60 1230.00 2440.00 FA B4 G2 0 / 59
80 353/352 17.60 1230.00 2440.00 MA B4 G1 0 / 23
79 327 17.60 1230.00 2440.00 MA B4 G1 0 / 40
78 257 15.00 1220.00 2440.00 FA B4 CI 17 0 / 31
77 259 15.00 1220.00 2440.00 FA B4 CI 17 0 / 50
76 726/41 14.60 1230.00 2440.00 MA B4 G1 0 / 29
75 257/382 15.00 1220.00 2440.00 FA B4 CI 17 0 / 50

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
637 566 2026-09-16 M:9 / W:38 752 Shift B P1.CU.3 2.40 x 915.00 x 1830.00 FM E1 UTY E 200 P:0 / B:200 O:400 / B:-200 0.003181 0.636291 Del
636 565 2026-09-16 M:9 / W:38 745 Shift B P1.CU.4 2.40 x 915.00 x 1830.00 FM E1 UTY E 200 P:0 / B:200 O:400 / B:-200 0.003181 0.636291 Del
635 564 2026-09-16 M:9 / W:38 746 Shift B P1.CU.1 2.40 x 915.00 x 1830.00 FM E1 UTY E 200 P:0 / B:200 O:400 / B:-200 0.003181 0.636291 Del
634 563 2026-09-16 M:9 / W:38 806 Shift B P1.CU.3 2.40 x 915.00 x 1830.00 FM E1 UTY E 173 P:0 / B:173 O:345 / B:-172 0.003181 0.550392 Del
633 562 2026-09-16 M:9 / W:38 790 Shift B P1.CU.5 2.40 x 915.00 x 1830.00 FM E1 UTY E 200 P:0 / B:200 O:400 / B:-200 0.003181 0.636291 Del
632 561 2026-09-16 M:9 / W:38 805 Shift B P1.CU.3 2.40 x 915.00 x 1830.00 FM E1 UTY E 200 P:0 / B:200 O:400 / B:-200 0.003181 0.636291 Del
631 648 2026-09-17 M:9 / W:38 756 Shift A P1.CU.1 5.00 x 915.00 x 1830.00 FM E2 UTY B(1xP) 84 P:0 / B:84 O:168 / B:-84 0.006698 0.562615 Del
630 619 2026-09-17 M:9 / W:38 728 Shift A P1.CU.2 2.40 x 915.00 x 1830.00 FM E1 UTY E 200 P:0 / B:200 O:380 / B:-180 0.003181 0.636291 Del
629 557 2026-09-17 M:9 / W:38 842 Shift A P1.CU.3 11.60 x 915.00 x 1830.00 FA B4 G2 62 P:0 / B:62 O:124 / B:-62 0.017749 1.100449 Del
628 647 2026-09-17 M:9 / W:38 x//861 Shift A P1.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:0 / B:60 O:120 / B:-60 0.017749 1.064950 Del