Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
505 845 11.60 915.00 1830.00 FA B4 G2 -60 / 60
504 670 11.60 915.00 1830.00 FA B4 CI 17 G2 0 / 60
503 705//759 11.60 915.00 1830.00 FA B4 G2 0 / 40
502 847 11.60 915.00 1830.00 FA B4 G2 18 / 59
501 718 11.60 1220.00 2440.00 FA B4 G2 18 / 18
500 604 11.60 915.00 1830.00 FA B4 G2 60 / 60
498 x 11.60 915.00 1830.00 FA B4 G2 0 / 15
496 842 11.60 915.00 1830.00 FA B4 G2 62 / 62
495 860 11.60 915.00 1830.00 FA B4 G2 0 / 59
494 843 11.60 915.00 1830.00 FA B4 G2 0 / 65
Total: 536 data
< Prev Halaman 8 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
341 382 2026-09-14 M:9 / W:38 710 Shift A P2.CU.1 5.00 x 920.00 x 2440.00 FM E1 UTY E 100 P:1 / B:99 O:0 / B:0 0.008979 0.897920 Del
340 381 2026-09-25 M:9 / W:39 x Shift A P2.CU.3 11.20 x 1220.00 x 2440.00 FM E1 BB CC 11 P:0 / B:11 O:0 / B:0 0.030363 0.333997 Del
339 380 2026-09-14 M:9 / W:38 583 Shift A P2.CU.3 11.20 x 1220.00 x 2440.00 FM E1 BB CC 3 P:0 / B:3 O:0 / B:37 0.030363 0.091090 Del
338 379 2026-09-14 M:9 / W:38 747 Shift A P2.CU.3 2.70 x 1220.00 x 2440.00 FA E1 UTY 140 P:3 / B:137 O:0 / B:59 0.006549 0.916854 Del
337 178 2026-09-09 M:9 / W:37 577 Shift B P2.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 44 P:0 / B:44 O:0 / B:0 0.041675 1.833709 Del
336 168 2026-09-09 M:9 / W:37 535//534 Shift A P2.CU.4 15.00 x 1220.00 x 2440.00 FA B4 CI 17 40 P:2 / B:38 O:0 / B:0 0.041675 1.667008 Del
334 378 2026-09-09 M:9 / W:37 447 Shift A P2.CU.4 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:0 / B:60 O:0 / B:0 0.017749 1.064950 Del
332 181 2026-09-24 M:9 / W:39 582 Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E2 CI D2 144 P:0 / B:144 O:0 / B:56 0.006549 0.943050 Del
331 177 2026-09-09 M:9 / W:37 507 Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E2 CI D2 128 P:10 / B:118 O:0 / B:0 0.006549 0.838267 Del
330 377 2026-09-09 M:9 / W:37 515 Shift B P2.CU.3 11.60 x 915.00 x 1830.00 FA B4 G2 62 P:0 / B:62 O:0 / B:0 0.017749 1.100449 Del