Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 274 | 458 | 11.60 | 910.00 | 1820.00 | FA B4 G2 | 0 / 60 | |
| 273 | 534 | 15.00 | 1220.00 | 2440.00 | FA B4 CI 17 | 0 / 31 | |
| 272 | 535//534 | 15.00 | 1220.00 | 2440.00 | FA B4 CI 17 | 0 / 40 | |
| 271 | x | 15.00 | 1220.00 | 2440.00 | FA B4 BB CC LU DRI P | 0 / 11 | |
| 270 | x | 8.60 | 1230.00 | 2440.00 | MA B4 LU DRI PTS P1+ | 0 / 20 | |
| 269 | x | 18.00 | 1220.00 | 2440.00 | FA B4 BB CC LU DRI P | 0 / 7 | |
| 268 | 484 | 9.00 | 1220.00 | 2440.00 | FA E2 LKL UTY KRUING | 0 / 80 | |
| 267 | 325 | 9.00 | 1220.00 | 2440.00 | FA E2 BB CC | 0 / 80 | |
| 266 | 542 | 5.00 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 100 | |
| 265 | 502 | 5.00 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 100 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 543 | 575 | 2026-09-02 | M:9 / W:36 | 350 | Shift A | P1.CU.3 | 20.50 x 1220.00 x 2440.00 | MA B4 G1 | 35 | P:0 / B:35 | O:35 / B:0 | 0.058048 | 2.031666 | Del |
| 542 | 574 | 2026-09-02 | M:9 / W:36 | 244 | Shift B | P1.CU.5 | 11.60 x 915.00 x 1830.00 | FA B4 G2 | 65 | P:0 / B:65 | O:64 / B:1 | 0.017749 | 1.153696 | Del |
| 541 | 573 | 2026-09-02 | M:9 / W:36 | 243 | Shift B | P1.CU.3 | 11.60 x 915.00 x 1830.00 | FA B4 G2 | 55 | P:0 / B:55 | O:0 / B:55 | 0.017749 | 0.976204 | Del |
| 538 | 570 | 2026-09-02 | M:9 / W:36 | 324 | Shift B | P1.CU.1 | 11.60 x 1230.00 x 2440.00 | MA B4 G1 | 46 | P:0 / B:46 | O:46 / B:0 | 0.031813 | 1.463385 | Del |
| 537 | 462 | 2026-09-12 | M:9 / W:37 | 698 | Shift A | P1.CU.1 | 6.00 x 1220.00 x 2440.00 | FA B4 BB CC | 50 | P:0 / B:50 | O:50 / B:0 | 0.014884 | 0.744200 | Del |
| 536 | 548 | 2026-09-02 | M:9 / W:36 | 841 | Shift A | P1.CU.2 | 11.60 x 915.00 x 1830.00 | FA B4 G2 | 50 | P:0 / B:50 | O:50 / B:0 | 0.017749 | 0.887459 | Del |
| 535 | 569 | 2026-09-16 | M:September / W:38 | x | Shift A | P1.CU.2 | 20.50 x 1220.00 x 2440.00 | FM B4 G1 | 5 | P:0 / B:5 | O:0 / B:5 | 0.058048 | 0.290238 | Del |
| 534 | 560 | 2026-09-16 | M:September / W:38 | 784 | Shift A | P1.CU.2 | 2.40 x 915.00 x 1830.00 | FM E1 UTY E | 199 | P:0 / B:199 | O:199 / B:0 | 0.003181 | 0.633110 | Del |
| 533 | 547 | 2026-09-16 | M:September / W:38 | 679 | Shift A | P1.CU.2 | 11.60 x 915.00 x 1830.00 | FA B4 G2 | 41 | P:0 / B:41 | O:41 / B:0 | 0.017749 | 0.727716 | Del |
| 532 | 541 | 2026-09-16 | M:September / W:38 | 490 | Shift A | P1.CU.1 | 2.70 x 1220.00 x 2440.00 | FA E1 UTY | 200 | P:0 / B:200 | O:200 / B:0 | 0.006549 | 1.309792 | Del |