Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
535 789 2.40 915.00 1830.00 FM E1 UTY E 0 / 204
534 823//821 8.60 1220.00 2440.00 MA B4 G1 21 / 72
533 777//776 15.00 1220.00 2440.00 FA B4 CI 17 41 / 41
532 796//801 8.60 915.00 1830.00 MA B4 G1 80 / 80
531 x//917 8.60 1220.00 2440.00 MA B4 G1 0 / 68
530 x 15.00 1220.00 2440.00 FA B4 CI 17 0 / 12
528 849//848 14.60 915.00 1830.00 MA B4 G1 0 / 60
527 631 17.60 1220.00 2440.00 FA B4 CI 17 -25 / 39
526 650 18.00 1220.00 2440.00 FA B4 CI 17 0 / 25
525 650 18.00 920.00 2440.00 FA B4 CI 17 0 / 26
Total: 544 data
< Prev Halaman 6 dari 55 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
664 563 2026-09-21 M:9 / W:39 858 Shift A P2.CU.4 3.00 x 1220.00 x 2440.00 FA B4 BB CC 95 P:0 / B:95 O:0 / B:105 0.007442 0.706990 Del
662 585 2026-09-21 M:9 / W:39 850//873 Shift A P2.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 20 P:1 / B:19 O:0 / B:22 0.022773 0.455450 Del
661 584 2026-09-21 M:9 / W:39 x//917//913 Shift A P2.CU.3 14.60 x 915.00 x 1830.00 MA B4 G1 44 P:0 / B:44 O:0 / B:0 0.022773 1.001991 Del
659 583 2026-09-21 M:9 / W:39 864 Shift A P2.CU.4 14.60 x 915.00 x 1830.00 MA B4 G1 16 P:4 / B:12 O:0 / B:0 0.022773 0.364360 Del
658 581 2026-09-21 M:9 / W:39 879 Shift A P2.CU.2 14.60 x 915.00 x 1830.00 MA B4 G1 50 P:0 / B:50 O:0 / B:0 0.022773 1.138626 Del
657 579 2026-09-21 M:9 / W:39 878//864//773 Shift B P2.CU.7 14.60 x 915.00 x 1830.00 MA B4 G1 44 P:0 / B:44 O:0 / B:0 0.022773 1.001991 Del
656 578 2026-09-21 M:9 / W:39 734//850 Shift B P2.CU.1 14.60 x 915.00 x 1830.00 MA B4 G1 5 P:0 / B:5 O:0 / B:39 0.022773 0.113863 Del
655 577 2026-09-21 M:9 / W:39 x Shift B P2.CU.3 14.60 x 920.00 x 1830.00 MA B4 G1 42 P:1 / B:41 O:0 / B:0 0.022897 0.961672 Del
654 574 2026-09-21 M:9 / W:39 873 Shift A P2.CU.9 14.60 x 915.00 x 1830.00 MA B4 G1 31 P:3 / B:28 O:0 / B:0 0.022773 0.705948 Del
653 573 2026-09-21 M:9 / W:39 781 Shift A P2.CU.1 6.00 x 1220.00 x 2440.00 FA B4 BB CC 97 P:5 / B:92 O:0 / B:0 0.014884 1.443748 Del