Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
505 845 11.60 915.00 1830.00 FA B4 G2 -60 / 60
504 670 11.60 915.00 1830.00 FA B4 CI 17 G2 0 / 60
503 705//759 11.60 915.00 1830.00 FA B4 G2 0 / 40
502 847 11.60 915.00 1830.00 FA B4 G2 18 / 59
501 718 11.60 1220.00 2440.00 FA B4 G2 18 / 18
500 604 11.60 915.00 1830.00 FA B4 G2 60 / 60
498 x 11.60 915.00 1830.00 FA B4 G2 0 / 15
496 842 11.60 915.00 1830.00 FA B4 G2 62 / 62
495 860 11.60 915.00 1830.00 FA B4 G2 0 / 59
494 843 11.60 915.00 1830.00 FA B4 G2 0 / 65
Total: 536 data
< Prev Halaman 8 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
298 217 2026-09-09 M:9 / W:37 561 Shift A P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 5 P:0 / B:5 O:0 / B:42 0.041675 0.208376 Del
296 221 2026-09-09 M:9 / W:37 591 Shift A P2.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 76 P:2 / B:74 O:0 / B:0 0.011907 0.904947 Del
295 367 2026-09-10 M:9 / W:37 x Shift B P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 38 P:1 / B:37 O:0 / B:0 0.041675 1.583658 Del
294 201 2026-09-10 M:9 / W:37 312 Shift A P2.CU.2 3.00 x 1220.00 x 2440.00 FA B4 BB CC 85 P:17 / B:68 O:0 / B:91 0.007442 0.632570 Del
292 366 2026-09-08 M:9 / W:37 X Shift A P2.CU.1 8.20 x 1220.00 x 2440.00 FM E1 78 P:27 / B:51 O:0 / B:0 0.021433 1.671771 Del
291 323 2026-09-08 M:9 / W:37 939 Shift A P2.CU.1 8.20 x 1220.00 x 2440.00 FM E1 BB CC 23 P:5 / B:18 O:0 / B:47 0.021433 0.492958 Del
290 176 2026-09-08 M:9 / W:37 508 Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E2 CI D2 89 P:4 / B:85 O:0 / B:111 0.006549 0.582857 Del
287 171 2026-09-08 M:9 / W:37 440//410 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 172 P:0 / B:172 O:0 / B:84 0.003181 0.547210 Del
286 172 2026-09-08 M:9 / W:37 99 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 196 P:0 / B:196 O:0 / B:0 0.003181 0.623565 Del
285 295 2026-09-08 M:9 / W:37 505//499 Shift A P2.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 41 P:0 / B:41 O:0 / B:0 0.017556 0.719785 Del