Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
639 815//785 2.40 915.00 1830.00 FM E1 UTY E 0 / 237
638 782//779 2.40 915.00 1830.00 FM E1 UTY E 0 / 286
637 778//782 2.40 915.00 1830.00 FM E1 UTY E 0 / 232
636 768//778 2.40 915.00 1830.00 FM E1 UTY E 0 / 264
635 751 2.40 915.00 1830.00 FM E1 UTY E 0 / 222
634 904//757 2.40 915.00 1830.00 FM E1 UTY E 0 / 260
633 904 2.40 915.00 1830.00 FM E1 UTY E 0 / 240
632 583 11.20 1220.00 2440.00 FM E1 BB CC 0 / 40
631 732 11.20 1220.00 2440.00 FM E1 BB CC 0 / 43
630 709 30.00 1220.00 2440.00 FM PENOL MAHONI 9 / 9

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
531 539 2026-09-16 M:September / W:38 837 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
530 526 2026-09-16 M:September / W:38 48 Shift A P1.CU.3 18.00 x 1220.00 x 2440.00 FM E2 CI 17 27 P:0 / B:27 O:0 / B:27 0.050606 1.366351 Del
529 525 2026-09-15 M:September / W:38 571 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
528 524 2026-09-15 M:September / W:38 x Shift B P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
527 523 2026-09-15 M:September / W:38 x Shift A P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 198 P:0 / B:198 O:0 / B:198 0.006549 1.296694 Del
526 522 2026-09-15 M:September / W:38 569 Shift A P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 196 P:0 / B:196 O:0 / B:196 0.006549 1.283596 Del
525 520 2026-09-15 M:September / W:38 762 Shift B P1.CU.1 14.60 x 920.00 x 2440.00 FA B4 CI 17 30 P:0 / B:30 O:30 / B:0 0.030529 0.915878 Del
524 519 2026-09-15 M:September / W:38 x Shift B P1.CU.2 11.60 x 1220.00 x 2440.00 MA B4 G1 46 P:0 / B:46 O:0 / B:46 0.031554 1.451488 Del
523 518 2026-09-16 M:September / W:38 665 Shift A P1.CU.1 11.60 x 1220.00 x 2440.00 MA B4 G1 37 P:0 / B:37 O:37 / B:0 0.031554 1.167501 Del
522 517 2026-09-16 M:September / W:38 568 Shift A P1.CU.1 20.50 x 1220.00 x 2440.00 FM B4 G1 30 P:0 / B:30 O:0 / B:30 0.058048 1.741428 Del