Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
680 821 8.60 1220.00 2440.00 MA B4 G1 0 / 67
679 921//881 14.60 915.00 1830.00 MA B4 G1 0 / 51
678 879 14.60 915.00 1830.00 MA B4 G1 0 / 50
677 x 3.40 1220.00 2440.00 FM B4 BB CC 0 / 200
676 x 3.40 1220.00 2440.00 FM B4 BB CC 0 / 200
675 913 14.60 915.00 1830.00 MA B4 G1 0 / 39
674 197 15.00 1220.00 2440.00 FM B4 BB CC 0 / 58
673 x//917//913 14.60 915.00 1830.00 MA B4 G1 0 / 44
672 734//850 14.60 915.00 1830.00 MA B4 G1 0 / 50
671 850//873 14.60 915.00 1830.00 MA B4 G1 0 / 50

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
531 539 2026-09-16 M:September / W:38 837 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
530 526 2026-09-16 M:September / W:38 48 Shift A P1.CU.3 18.00 x 1220.00 x 2440.00 FM E2 CI 17 27 P:0 / B:27 O:0 / B:27 0.050606 1.366351 Del
529 525 2026-09-15 M:September / W:38 571 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
528 524 2026-09-15 M:September / W:38 x Shift B P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
527 523 2026-09-15 M:September / W:38 x Shift A P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 198 P:0 / B:198 O:0 / B:198 0.006549 1.296694 Del
526 522 2026-09-15 M:September / W:38 569 Shift A P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 196 P:0 / B:196 O:0 / B:196 0.006549 1.283596 Del
525 520 2026-09-15 M:September / W:38 762 Shift B P1.CU.1 14.60 x 920.00 x 2440.00 FA B4 CI 17 30 P:0 / B:30 O:30 / B:0 0.030529 0.915878 Del
524 519 2026-09-15 M:September / W:38 x Shift B P1.CU.2 11.60 x 1220.00 x 2440.00 MA B4 G1 46 P:0 / B:46 O:0 / B:46 0.031554 1.451488 Del
523 518 2026-09-16 M:September / W:38 665 Shift A P1.CU.1 11.60 x 1220.00 x 2440.00 MA B4 G1 37 P:0 / B:37 O:37 / B:0 0.031554 1.167501 Del
522 517 2026-09-16 M:September / W:38 568 Shift A P1.CU.1 20.50 x 1220.00 x 2440.00 FM B4 G1 30 P:0 / B:30 O:0 / B:30 0.058048 1.741428 Del