Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
482 861//705 11.60 915.00 1830.00 FA B4 G2 41 / 59
481 719//718 11.60 915.00 1830.00 FA B4 G2 61 / 61
480 772 2.40 915.00 1830.00 FM E1 UTY E 169 / 200
479 846 11.60 915.00 1830.00 FA B4 G2 0 / 52
478 802 11.60 915.00 1830.00 FA B4 G2 0 / 49
477 756 5.00 915.00 1830.00 FM E2 UTY B(1xP) 35 / 84
476 680 11.60 915.00 1830.00 FA B4 G2 64 / 64
475 805 2.40 915.00 1830.00 FM E1 UTY E 200 / 200
474 x 18.00 1220.00 2440.00 FA E1 UTY 32 / 32
473 679 11.60 915.00 1830.00 FA B4 G2 41 / 41
Total: 536 data
< Prev Halaman 10 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
261 121 2026-09-06 M:9 / W:36 230 Shift A P2.CU.2 18.00 x 1220.00 x 2440.00 FM E2 LKL C11 7 28 P:0 / B:28 O:0 / B:0 0.050606 1.416957 Del
259 212 2026-09-06 M:9 / W:36 52//29 Shift A P2.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 20 P:3 / B:17 O:0 / B:0 0.050606 1.012112 Del
258 120 2026-09-06 M:9 / W:36 230 Shift A P2.CU.1 18.00 x 1220.00 x 2440.00 FM E2 LKL C11 7 30 P:0 / B:30 O:0 / B:0 0.050606 1.518168 Del
257 283 2026-09-06 M:9 / W:36 234 Shift A P2.CU.1 18.00 x 1220.00 x 2440.00 FM E2 LKL C11 7 10 P:0 / B:10 O:0 / B:13 0.050606 0.506056 Del
256 129 2026-09-05 M:9 / W:36 420 Shift A P2.CU.3 14.60 x 920.00 x 1830.00 MA B4 G1 21 P:0 / B:21 O:0 / B:19 0.022897 0.480836 Del
252 83 2026-09-05 M:9 / W:36 452/451 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 158 P:0 / B:158 O:0 / B:0 0.003181 0.502670 Del
251 84 2026-09-05 M:9 / W:36 451/432 Shift A P2.CU.1 2.40 x 915.00 x 1830.00 FJB E1 UTY E 58 P:8 / B:50 O:0 / B:192 0.003181 0.184524 Del
249 84 2026-09-05 M:9 / W:36 451/432 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 192 P:9 / B:183 O:0 / B:58 0.003181 0.610839 Del
247 362 2026-09-05 M:9 / W:36 123 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FM E1 UTY E 184 P:11 / B:173 O:0 / B:0 0.003181 0.585388 Del
245 126 2026-09-05 M:9 / W:36 433 Shift A P2.CU.2 2.40 x 915.00 x 1830.00 FJB E1 UTY E 185 P:31 / B:154 O:0 / B:15 0.003181 0.588569 Del