Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
136 403 11.60 915.00 1830.00 FA B4 G2 0 / 60
135 402 11.60 915.00 1830.00 FA B4 G2 0 / 60
134 423 11.60 915.00 1830.00 FA B4 G2 0 / 59
133 391 11.60 915.00 1830.00 FA B4 G2 0 / 62
132 818 20.50 915.00 1830.00 MA B4 G1 0 / 20
131 804 20.50 915.00 1830.00 MA B4 G1 0 / 30
130 359 11.60 915.00 1830.00 MA B4 G1 0 / 60
129 381 11.60 915.00 1830.00 MA B4 G1 0 / 60
128 408 11.60 915.00 1830.00 MA B4 G1 0 / 60
127 407 11.60 915.00 1830.00 MA B4 G1 0 / 60

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
535 569 2026-09-16 M:September / W:38 x Shift A P1.CU.2 20.50 x 1220.00 x 2440.00 FM B4 G1 5 P:0 / B:5 O:0 / B:5 0.058048 0.290238 Del
534 560 2026-09-16 M:September / W:38 784 Shift A P1.CU.2 2.40 x 915.00 x 1830.00 FM E1 UTY E 199 P:0 / B:199 O:199 / B:0 0.003181 0.633110 Del
533 547 2026-09-16 M:September / W:38 679 Shift A P1.CU.2 11.60 x 915.00 x 1830.00 FA B4 G2 41 P:0 / B:41 O:41 / B:0 0.017749 0.727716 Del
532 541 2026-09-16 M:September / W:38 490 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:200 / B:0 0.006549 1.309792 Del
531 539 2026-09-16 M:September / W:38 837 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
530 526 2026-09-16 M:September / W:38 48 Shift A P1.CU.3 18.00 x 1220.00 x 2440.00 FM E2 CI 17 27 P:0 / B:27 O:0 / B:27 0.050606 1.366351 Del
529 525 2026-09-15 M:September / W:38 571 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
528 524 2026-09-15 M:September / W:38 x Shift B P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
527 523 2026-09-15 M:September / W:38 x Shift A P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 198 P:0 / B:198 O:0 / B:198 0.006549 1.296694 Del
526 522 2026-09-15 M:September / W:38 569 Shift A P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 196 P:0 / B:196 O:0 / B:196 0.006549 1.283596 Del