Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
516 527 17.60 915.00 1830.00 MA B4 G1 39 / 39
514 529 17.60 915.00 1830.00 MA B4 G1 34 / 34
513 835 11.60 915.00 1830.00 FA B4 G2 49 / 49
512 841 11.60 915.00 1830.00 FA B4 G2 50 / 50
511 x 9.00 1220.00 2440.00 FA E1 UTY 28 / 28
510 705 11.60 915.00 1830.00 FA B4 G2 0 / 43
509 788 2.40 915.00 1830.00 FM E1 UTY E 0 / 193
508 844 11.60 915.00 1830.00 FA B4 G2 0 / 60
507 792 11.60 915.00 2440.00 FA B4 G2 40 / 40
506 794 11.60 915.00 1830.00 FA B4 G2 0 / 60
Total: 536 data
< Prev Halaman 7 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
273 364 2026-09-08 M:9 / W:37 382//472// Shift B P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 37 P:0 / B:37 O:0 / B:4 0.041675 1.541982 Del
272 167 2026-09-08 M:9 / W:37 518 Shift A P2.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 98 P:1 / B:97 O:0 / B:0 0.011907 1.166906 Del
271 335 2026-09-08 M:9 / W:37 x Shift B P2.CU.2 11.60 x 920.00 x 1830.00 MA B4 G1 39 P:7 / B:32 O:0 / B:0 0.017846 0.696000 Del
270 162 2026-09-08 M:9 / W:37 325 Shift A P2.CU.2 9.00 x 1220.00 x 2440.00 FA E2 BB CC 80 P:2 / B:78 O:0 / B:0 0.023814 1.905152 Del
269 175 2026-09-08 M:9 / W:37 495 Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E2 CI D2 196 P:5 / B:191 O:0 / B:0 0.006549 1.283596 Del
268 161 2026-09-08 M:9 / W:37 864 Shift A P2.CU.2 9.00 x 1220.00 x 2440.00 FM E2 LKL C11 7 59 P:9 / B:50 O:0 / B:0 0.023814 1.405050 Del
265 273 2026-09-07 M:9 / W:37 476 Shift A P2.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 15 P:0 / B:15 O:0 / B:16 0.041675 0.625128 Del
264 293 2026-09-07 M:9 / W:37 454//453 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:4 / B:56 O:0 / B:0 0.031813 1.908763 Del
262 363 2026-09-07 M:9 / W:37 940 Shift A P2.CU.2 8.20 x 1220.00 x 2440.00 FM E1 BB CC 47 P:4 / B:43 O:0 / B:0 0.021433 1.007349 Del
261 121 2026-09-06 M:9 / W:36 230 Shift A P2.CU.2 18.00 x 1220.00 x 2440.00 FM E2 LKL C11 7 28 P:0 / B:28 O:0 / B:0 0.050606 1.416957 Del