Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
629 871 11.60 915.00 1830.00 FA B4 G2 0 / 10
628 741//724 13.00 1220.00 2440.00 FA E2 BB CC 0 / 33
626 846 11.60 915.00 1830.00 FA B4 G2 0 / 52
625 731 2.40 915.00 1830.00 FM E1 UTY E 0 / 230
624 772 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
623 x 2.40 915.00 1830.00 FM E1 UTY E 0 / 192
622 789 2.40 915.00 1830.00 FM E1 UTY E 0 / 204
621 804 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
620 727 2.40 915.00 1830.00 FM E1 UTY E 0 / 200
619 728 2.40 915.00 1830.00 FM E1 UTY E 0 / 200

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
479 469 2026-09-14 M:September / W:38 722 Shift B P1.CU.3 14.60 x 915.00 x 1830.00 MA B4 G1 42 P:0 / B:42 O:0 / B:42 0.022773 0.956446 Del
478 468 2026-09-15 M:September / W:38 725//722 Shift A P1.CU.1 14.60 x 915.00 x 1830.00 MA B4 G1 43 P:1 / B:42 O:41 / B:1 0.022773 0.979218 Del
477 467 2026-09-14 M:September / W:38 634//725 Shift B P1.CU.1 14.60 x 915.00 x 1830.00 MA B4 G1 27 P:6 / B:21 O:0 / B:21 0.022773 0.614858 Del
476 466 2026-09-14 M:September / W:38 634 Shift B P1.CU.3 14.60 x 915.00 x 1830.00 MA B4 G1 42 P:0 / B:42 O:0 / B:42 0.022773 0.956446 Del
475 465 2026-09-14 M:September / W:38 669 Shift A P1.CU.1 18.00 x 1220.00 x 2440.00 FA B4 BB CC 32 P:1 / B:31 O:0 / B:31 0.050606 1.619379 Del
474 464 2026-09-14 M:September / W:38 688//687 Shift A P1.CU.2 6.00 x 1220.00 x 2440.00 FA B4 BB CC 115 P:1 / B:114 O:0 / B:114 0.014884 1.711660 Del
473 463 2026-09-14 M:September / W:38 698//688 Shift A P1.CU.2 6.00 x 1220.00 x 2440.00 FA B4 BB CC 98 P:0 / B:98 O:0 / B:98 0.014884 1.458632 Del
472 461 2026-09-14 M:September / W:38 713 Shift A P1.CU.2 6.00 x 1220.00 x 2440.00 FA B4 BB CC 59 P:0 / B:59 O:0 / B:59 0.014884 0.878156 Del
471 460 2026-09-14 M:September / W:38 714//713 Shift A P1.CU.1 6.00 x 1220.00 x 2440.00 FA B4 BB CC 74 P:0 / B:74 O:0 / B:74 0.014884 1.101416 Del
470 459 2026-09-14 M:September / W:38 715//714 Shift A P1.CU.2 6.00 x 1220.00 x 2440.00 FA B4 BB CC 65 P:0 / B:65 O:0 / B:65 0.014884 0.967460 Del