Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
526 650 18.00 1220.00 2440.00 FA B4 CI 17 0 / 25
525 650 18.00 920.00 2440.00 FA B4 CI 17 26 / 26
524 849 14.60 915.00 1830.00 MA B4 G1 40 / 40
523 64 18.00 1220.00 2440.00 FA B4 11 / 29
522 740 15.00 1220.00 0.00 FA B4 CI 17 32 / 32
521 765 14.60 915.00 1830.00 MA B4 G1 27 / 27
520 737 18.00 1220.00 2440.00 FA E2 BB CC 24 / 24
519 765 14.60 915.00 1830.00 MA B4 G1 46 / 46
518 x 11.20 1220.00 2440.00 FM E1 13 / 13
517 X 11.20 1220.00 2440.00 FM E1 9 / 9
Total: 536 data
< Prev Halaman 6 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
273 364 2026-09-08 M:9 / W:37 382//472// Shift B P2.CU.2 15.00 x 1220.00 x 2440.00 FA B4 CI 17 37 P:0 / B:37 O:0 / B:4 0.041675 1.541982 Del
272 167 2026-09-08 M:9 / W:37 518 Shift A P2.CU.2 5.00 x 1220.00 x 2440.00 FA E2 CI D2 98 P:1 / B:97 O:0 / B:0 0.011907 1.166906 Del
271 335 2026-09-08 M:9 / W:37 x Shift B P2.CU.2 11.60 x 920.00 x 1830.00 MA B4 G1 39 P:7 / B:32 O:0 / B:0 0.017846 0.696000 Del
270 162 2026-09-08 M:9 / W:37 325 Shift A P2.CU.2 9.00 x 1220.00 x 2440.00 FA E2 BB CC 80 P:2 / B:78 O:0 / B:0 0.023814 1.905152 Del
269 175 2026-09-08 M:9 / W:37 495 Shift A P2.CU.2 2.70 x 1220.00 x 2440.00 FA E2 CI D2 196 P:5 / B:191 O:0 / B:0 0.006549 1.283596 Del
268 161 2026-09-08 M:9 / W:37 864 Shift A P2.CU.2 9.00 x 1220.00 x 2440.00 FM E2 LKL C11 7 59 P:9 / B:50 O:0 / B:0 0.023814 1.405050 Del
267 279 2026-09-07 M:9 / W:37 10 Shift A P2.CU.2 6.00 x 1220.00 x 2440.00 FA E2 BB CC 40 P:8 / B:32 O:0 / B:53 0.014884 0.595360 Del
265 273 2026-09-07 M:9 / W:37 476 Shift A P2.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 15 P:0 / B:15 O:0 / B:16 0.041675 0.625128 Del
264 293 2026-09-07 M:9 / W:37 454//453 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:4 / B:56 O:0 / B:0 0.031813 1.908763 Del
262 363 2026-09-07 M:9 / W:37 940 Shift A P2.CU.2 8.20 x 1220.00 x 2440.00 FM E1 BB CC 47 P:4 / B:43 O:0 / B:0 0.021433 1.007349 Del