Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 585 | 32 | 5.00 | 915.00 | 1830.00 | FM E2 LKL C11 7 | 0 / 64 | |
| 584 | 31 | 5.00 | 915.00 | 1830.00 | FM E2 LKL C11 7 | 0 / 101 | |
| 583 | 30 | 5.00 | 915.00 | 1830.00 | FM E2 LKL C11 7 | 0 / 100 | |
| 582 | 939 | 8.20 | 1220.00 | 2440.00 | FM E1 BB CC | 0 / 70 | |
| 581 | 446//445 | 11.60 | 915.00 | 1830.00 | FA B4 G2 | 0 / 56 | |
| 580 | 417//377 | 20.50 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 35 | |
| 579 | 417 | 20.50 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 31 | |
| 578 | 409 | 17.60 | 1230.00 | 2440.00 | MA B4 G1 | 0 / 36 | |
| 577 | 379 | 20.50 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 30 | |
| 576 | 376 | 20.50 | 1220.00 | 2440.00 | MA B4 G1 | 0 / 30 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 477 | 467 | 2026-09-14 | M:September / W:38 | 634//725 | Shift B | P1.CU.1 | 14.60 x 915.00 x 1830.00 | MA B4 G1 | 27 | P:6 / B:21 | O:0 / B:21 | 0.022773 | 0.614858 | Del |
| 476 | 466 | 2026-09-14 | M:September / W:38 | 634 | Shift B | P1.CU.3 | 14.60 x 915.00 x 1830.00 | MA B4 G1 | 42 | P:0 / B:42 | O:0 / B:42 | 0.022773 | 0.956446 | Del |
| 475 | 465 | 2026-09-14 | M:September / W:38 | 669 | Shift A | P1.CU.1 | 18.00 x 1220.00 x 2440.00 | FA B4 BB CC | 32 | P:1 / B:31 | O:0 / B:31 | 0.050606 | 1.619379 | Del |
| 474 | 464 | 2026-09-14 | M:September / W:38 | 688//687 | Shift A | P1.CU.2 | 6.00 x 1220.00 x 2440.00 | FA B4 BB CC | 115 | P:1 / B:114 | O:0 / B:114 | 0.014884 | 1.711660 | Del |
| 473 | 463 | 2026-09-14 | M:September / W:38 | 698//688 | Shift A | P1.CU.2 | 6.00 x 1220.00 x 2440.00 | FA B4 BB CC | 98 | P:0 / B:98 | O:0 / B:98 | 0.014884 | 1.458632 | Del |
| 472 | 461 | 2026-09-14 | M:September / W:38 | 713 | Shift A | P1.CU.2 | 6.00 x 1220.00 x 2440.00 | FA B4 BB CC | 59 | P:0 / B:59 | O:0 / B:59 | 0.014884 | 0.878156 | Del |
| 471 | 460 | 2026-09-14 | M:September / W:38 | 714//713 | Shift A | P1.CU.1 | 6.00 x 1220.00 x 2440.00 | FA B4 BB CC | 74 | P:0 / B:74 | O:0 / B:74 | 0.014884 | 1.101416 | Del |
| 470 | 459 | 2026-09-14 | M:September / W:38 | 715//714 | Shift A | P1.CU.2 | 6.00 x 1220.00 x 2440.00 | FA B4 BB CC | 65 | P:0 / B:65 | O:0 / B:65 | 0.014884 | 0.967460 | Del |
| 469 | 457 | 2026-09-14 | M:September / W:38 | 702//701 | Shift A | P1.CU.2 | 20.00 x 1220.00 x 2440.00 | MA B4 G1 | 31 | P:0 / B:31 | O:0 / B:31 | 0.056559 | 1.753335 | Del |
| 468 | 456 | 2026-09-14 | M:September / W:38 | 461 | Shift A | P1.CU.1 | 15.00 x 1220.00 x 2440.00 | FA B4 BB CC | 50 | P:7 / B:43 | O:0 / B:43 | 0.041675 | 2.083760 | Del |