Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
585 32 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 64
584 31 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 101
583 30 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 100
582 939 8.20 1220.00 2440.00 FM E1 BB CC 0 / 70
581 446//445 11.60 915.00 1830.00 FA B4 G2 0 / 56
580 417//377 20.50 1220.00 2440.00 MA B4 G1 0 / 35
579 417 20.50 1220.00 2440.00 MA B4 G1 0 / 31
578 409 17.60 1230.00 2440.00 MA B4 G1 0 / 36
577 379 20.50 1220.00 2440.00 MA B4 G1 0 / 30
576 376 20.50 1220.00 2440.00 MA B4 G1 0 / 30

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
477 467 2026-09-14 M:September / W:38 634//725 Shift B P1.CU.1 14.60 x 915.00 x 1830.00 MA B4 G1 27 P:6 / B:21 O:0 / B:21 0.022773 0.614858 Del
476 466 2026-09-14 M:September / W:38 634 Shift B P1.CU.3 14.60 x 915.00 x 1830.00 MA B4 G1 42 P:0 / B:42 O:0 / B:42 0.022773 0.956446 Del
475 465 2026-09-14 M:September / W:38 669 Shift A P1.CU.1 18.00 x 1220.00 x 2440.00 FA B4 BB CC 32 P:1 / B:31 O:0 / B:31 0.050606 1.619379 Del
474 464 2026-09-14 M:September / W:38 688//687 Shift A P1.CU.2 6.00 x 1220.00 x 2440.00 FA B4 BB CC 115 P:1 / B:114 O:0 / B:114 0.014884 1.711660 Del
473 463 2026-09-14 M:September / W:38 698//688 Shift A P1.CU.2 6.00 x 1220.00 x 2440.00 FA B4 BB CC 98 P:0 / B:98 O:0 / B:98 0.014884 1.458632 Del
472 461 2026-09-14 M:September / W:38 713 Shift A P1.CU.2 6.00 x 1220.00 x 2440.00 FA B4 BB CC 59 P:0 / B:59 O:0 / B:59 0.014884 0.878156 Del
471 460 2026-09-14 M:September / W:38 714//713 Shift A P1.CU.1 6.00 x 1220.00 x 2440.00 FA B4 BB CC 74 P:0 / B:74 O:0 / B:74 0.014884 1.101416 Del
470 459 2026-09-14 M:September / W:38 715//714 Shift A P1.CU.2 6.00 x 1220.00 x 2440.00 FA B4 BB CC 65 P:0 / B:65 O:0 / B:65 0.014884 0.967460 Del
469 457 2026-09-14 M:September / W:38 702//701 Shift A P1.CU.2 20.00 x 1220.00 x 2440.00 MA B4 G1 31 P:0 / B:31 O:0 / B:31 0.056559 1.753335 Del
468 456 2026-09-14 M:September / W:38 461 Shift A P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 BB CC 50 P:7 / B:43 O:0 / B:43 0.041675 2.083760 Del