Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
617 905 15.00 1220.00 2440.00 FA B4 CI 17 45 / 45
616 947 15.00 1220.00 2440.00 FA B4 CI 17 27 / 27
615 859 3.00 1220.00 2440.00 FA B4 BB CC 201 / 201
614 x 17.20 1220.00 2440.00 FM E1 7 / 7
613 923//x 11.60 1220.00 2440.00 MA B4 G1 22 / 22
612 665 11.60 1220.00 2440.00 MA B4 G1 37 / 37
611 910 15.00 1220.00 2440.00 FA B4 CI 17 50 / 50
610 924 11.60 1220.00 2440.00 MA B4 G1 60 / 60
609 923 11.60 1220.00 2440.00 MA B4 G1 53 / 53
608 944 11.60 1220.00 2440.00 MA B4 G1 60 / 60
Total: 536 data
< Prev Halaman 1 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
266 364 2026-09-07 M:9 / W:37 382//472// Shift B P2.CU.1 15.00 x 1220.00 x 2440.00 FA B4 CI 17 4 P:0 / B:4 O:0 / B:37 0.041675 0.166701 Del
265 273 2026-09-07 M:9 / W:37 476 Shift A P2.CU.3 15.00 x 1220.00 x 2440.00 FA B4 CI 17 15 P:0 / B:15 O:0 / B:16 0.041675 0.625128 Del
264 293 2026-09-07 M:9 / W:37 454//453 Shift A P2.CU.3 11.60 x 1230.00 x 2440.00 FA B4 G2 60 P:4 / B:56 O:0 / B:0 0.031813 1.908763 Del
263 150 2026-09-07 M:9 / W:37 422 Shift A P2.CU.2 11.60 x 920.00 x 1830.00 MA B4 G1 23 P:0 / B:23 O:0 / B:6 0.017846 0.410462 Del
262 363 2026-09-07 M:9 / W:37 940 Shift A P2.CU.2 8.20 x 1220.00 x 2440.00 FM E1 BB CC 47 P:4 / B:43 O:0 / B:0 0.021433 1.007349 Del
261 121 2026-09-06 M:9 / W:36 230 Shift A P2.CU.2 18.00 x 1220.00 x 2440.00 FM E2 LKL C11 7 28 P:0 / B:28 O:0 / B:0 0.050606 1.416957 Del
259 212 2026-09-06 M:9 / W:36 52//29 Shift A P2.CU.1 18.00 x 1220.00 x 2440.00 FM E1 UTY E 20 P:3 / B:17 O:0 / B:0 0.050606 1.012112 Del
258 120 2026-09-06 M:9 / W:36 230 Shift A P2.CU.1 18.00 x 1220.00 x 2440.00 FM E2 LKL C11 7 30 P:0 / B:30 O:0 / B:0 0.050606 1.518168 Del
257 283 2026-09-06 M:9 / W:36 234 Shift A P2.CU.1 18.00 x 1220.00 x 2440.00 FM E2 LKL C11 7 10 P:0 / B:10 O:0 / B:13 0.050606 0.506056 Del
256 129 2026-09-05 M:9 / W:36 420 Shift A P2.CU.3 14.60 x 920.00 x 1830.00 MA B4 G1 21 P:0 / B:21 O:0 / B:19 0.022897 0.480836 Del