Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
440 579 11.20 1220.00 2440.00 FM E1 BB CC 18 / 45
439 712 18.00 1220.00 2440.00 FA E2 BB CC 0 / 27
438 x 2.70 1220.00 2440.00 FA E1 UTY 200 / 200
437 592 18.00 1220.00 2440.00 FA E2 BB CC 0 / 35
436 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
435 569 2.70 1220.00 2440.00 FA E1 UTY 196 / 196
434 x 2.70 1220.00 2440.00 FA E1 UTY 0 / 6
433 x 2.70 1220.00 2440.00 FA E1 UTY 198 / 198
432 x 2.70 1220.00 2440.00 FA E2 D1 D2 0 / 199
431 780 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
Total: 536 data
< Prev Halaman 14 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
164 347 2026-09-03 M:9 / W:36 8384 Shift B P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 157 P:27 / B:130 O:0 / B:42 0.009604 1.507803 Del
163 95 2026-09-03 M:9 / W:36 328 Shift A P2.CU.1 17.60 x 1230.00 x 2440.00 MA B4 G1 10 P:0 / B:10 O:0 / B:30 0.049820 0.498199 Del
162 346 2026-09-03 M:9 / W:36 358/353 Shift A P2.CU.2 17.60 x 1230.00 x 2440.00 MA B4 G1 40 P:5 / B:35 O:0 / B:0 0.049820 1.992797 Del
160 103 2026-09-03 M:9 / W:36 416 Shift A P2.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 28 P:0 / B:28 O:0 / B:32 0.017556 0.491560 Del
156 344 2026-09-03 M:9 / W:36 379 Shift A P2.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 30 P:5 / B:25 O:0 / B:0 0.058048 1.741428 Del
155 343 2026-09-03 M:9 / W:36 417//377 Shift A P2.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 35 P:0 / B:35 O:0 / B:0 0.058048 2.031666 Del
153 341 2026-09-03 M:9 / W:36 X Shift A P2.CU.2 14.60 x 1220.00 x 2440.00 MA B4 G1 14 P:1 / B:13 O:0 / B:36 0.040484 0.566783 Del
150 280 2026-09-03 M:9 / W:36 327 Shift A P2.CU.2 17.60 x 1230.00 x 2440.00 MA B4 G1 17 P:0 / B:17 O:0 / B:0 0.049820 0.846939 Del
149 94 2026-09-03 M:9 / W:36 409//329 Shift A P2.CU.2 17.60 x 1230.00 x 2440.00 MA B4 G1 35 P:7 / B:28 O:0 / B:0 0.049820 1.743697 Del
146 52 2026-09-03 M:9 / W:36 298 Shift A P2.CU.1 14.60 x 1230.00 x 2440.00 MA B4 G1 50 P:0 / B:50 O:0 / B:0 0.040816 2.040816 Del