Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
493 818 11.60 915.00 1830.00 FA B4 G2 0 / 60
491 723 11.60 915.00 1830.00 FA B4 G2 0 / 35
490 807 11.60 915.00 1830.00 FA B4 G2 59 / 59
489 742 5.00 915.00 1830.00 FM E2 UTY B(1xP) 86 / 86
488 832 11.60 915.00 1830.00 FA B4 G2 55 / 55
487 794 11.60 915.00 1830.00 FA B4 G2 0 / 30
486 743 5.00 915.00 1830.00 FM E2 UTY B(1xP) 100 / 100
485 338 9.00 1220.00 2440.00 FA E2 LKL UTY KRUING 0 / 48
484 643 5.00 915.00 1830.00 FM E2 UTY B(1xP) 50 / 50
483 729 5.00 915.00 1830.00 FM E2 UTY B(1xP) 0 / 113
Total: 536 data
< Prev Halaman 9 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
168 289 2026-09-03 M:9 / W:36 398 Shift A P2.CU.2 2.70 x 915.00 x 1830.00 FJB E1 UTY E 61 P:0 / B:61 O:0 / B:137 0.003684 0.224711 Del
167 291 2026-09-03 M:9 / W:36 486 Shift A P2.CU.2 2.70 x 915.00 x 1830.00 FJB E1 UTY E 172 P:8 / B:164 O:0 / B:0 0.003684 0.633612 Del
166 281 2026-09-03 M:9 / W:36 337 Shift B P2.CU.1 11.60 x 1230.00 x 2440.00 FA B4 G2 25 P:0 / B:25 O:0 / B:14 0.031813 0.795318 Del
164 347 2026-09-03 M:9 / W:36 8384 Shift B P2.CU.2 3.70 x 1230.00 x 2440.00 FM B4 G1 157 P:27 / B:130 O:0 / B:42 0.009604 1.507803 Del
163 95 2026-09-03 M:9 / W:36 328 Shift A P2.CU.1 17.60 x 1230.00 x 2440.00 MA B4 G1 10 P:0 / B:10 O:0 / B:30 0.049820 0.498199 Del
162 346 2026-09-03 M:9 / W:36 358/353 Shift A P2.CU.2 17.60 x 1230.00 x 2440.00 MA B4 G1 40 P:5 / B:35 O:0 / B:0 0.049820 1.992797 Del
161 95 2026-09-03 M:9 / W:36 328 Shift A P2.CU.2 17.60 x 1230.00 x 2440.00 MA B4 G1 26 P:0 / B:26 O:0 / B:14 0.049820 1.295318 Del
160 103 2026-09-03 M:9 / W:36 416 Shift A P2.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 28 P:0 / B:28 O:0 / B:32 0.017556 0.491560 Del
156 344 2026-09-03 M:9 / W:36 379 Shift A P2.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 30 P:5 / B:25 O:0 / B:0 0.058048 1.741428 Del
155 343 2026-09-03 M:9 / W:36 417//377 Shift A P2.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 35 P:0 / B:35 O:0 / B:0 0.058048 2.031666 Del