Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
577 379 20.50 1220.00 2440.00 MA B4 G1 0 / 30
576 376 20.50 1220.00 2440.00 MA B4 G1 0 / 30
575 350 20.50 1220.00 2440.00 MA B4 G1 0 / 35
574 244 11.60 915.00 1830.00 FA B4 G2 0 / 65
573 243 11.60 915.00 1830.00 FA B4 G2 0 / 55
572 123 2.40 915.00 1830.00 FM E1 UTY E 0 / 184
571 123 2.40 915.00 1830.00 FM E1 UTY E 0 / 16
570 324 11.60 1230.00 2440.00 MA B4 G1 0 / 46
569 x 20.50 1220.00 2440.00 FM B4 G1 0 / 5
568 64 18.00 1220.00 2440.00 FA B4 0 / 29

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
471 460 2026-09-14 M:September / W:38 714//713 Shift A P1.CU.1 6.00 x 1220.00 x 2440.00 FA B4 BB CC 74 P:0 / B:74 O:0 / B:74 0.014884 1.101416 Del
470 459 2026-09-14 M:September / W:38 715//714 Shift A P1.CU.2 6.00 x 1220.00 x 2440.00 FA B4 BB CC 65 P:0 / B:65 O:0 / B:65 0.014884 0.967460 Del
469 457 2026-09-14 M:September / W:38 702//701 Shift A P1.CU.2 20.00 x 1220.00 x 2440.00 MA B4 G1 31 P:0 / B:31 O:0 / B:31 0.056559 1.753335 Del
468 456 2026-09-14 M:September / W:38 461 Shift A P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 BB CC 50 P:7 / B:43 O:0 / B:43 0.041675 2.083760 Del
467 455 2026-09-14 M:September / W:38 x Shift A P1.CU.1 5.00 x 1220.00 x 2440.00 FA E2 CI D2 56 P:0 / B:56 O:0 / B:56 0.011907 0.666803 Del
466 454 2026-09-12 M:September / W:37 747 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:1 / B:199 O:0 / B:199 0.006549 1.309792 Del
465 453 2026-09-12 M:September / W:37 666 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:2 / B:198 O:0 / B:198 0.006549 1.309792 Del
464 452 2026-09-12 M:September / W:37 738 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:1 / B:199 O:0 / B:199 0.006549 1.309792 Del
463 451 2026-09-12 M:September / W:37 646 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:13 / B:187 O:0 / B:187 0.006549 1.309792 Del
462 450 2026-09-12 M:September / W:37 676 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:1 / B:199 O:0 / B:199 0.006549 1.309792 Del