Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
399 689 2.70 920.00 1830.00 ALAS B4 0 / 204
398 624 2.70 1220.00 2440.00 FA E1 UTY 105 / 198
397 x 14.60 1220.00 2440.00 MA B4 G1 0 / 39
395 666 2.70 1220.00 2440.00 FA E1 UTY 170 / 198
394 664 11.60 1220.00 2440.00 MA B4 G1 0 / 63
393 651 11.60 1220.00 2440.00 MA B4 G1 39 / 39
392 646 2.70 1220.00 2440.00 FA E1 UTY 15 / 187
391 294 2.70 1220.00 2440.00 FA E2 D1 D2 108 / 196
390 477 11.60 910.00 1820.00 FA B4 G2 0 / 34
389 491//483 18.00 1220.00 2440.00 FM E2 CI 17 0 / 40
Total: 536 data
< Prev Halaman 18 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
185 349 2026-09-04 M:9 / W:36 324 Shift B P2.CU.2 11.60 x 1230.00 x 2440.00 MA B4 G1 46 P:9 / B:37 O:0 / B:0 0.031813 1.463385 Del
184 103 2026-09-04 M:9 / W:36 416 Shift A P2.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 32 P:2 / B:30 O:0 / B:28 0.017556 0.561783 Del
183 288 2026-09-04 M:9 / W:36 397 Shift A P2.CU.2 2.70 x 915.00 x 1830.00 FJB E1 UTY E 192 P:26 / B:166 O:0 / B:0 0.003684 0.707288 Del
182 92 2026-09-03 M:9 / W:36 8383 Shift A P2.CU.1 3.70 x 1230.00 x 2440.00 FM B4 G1 29 P:18 / B:11 O:0 / B:72 0.009604 0.278511 Del
181 106 2026-09-04 M:9 / W:36 402 Shift A P2.CU.1 11.60 x 915.00 x 1830.00 FA B4 G2 60 P:1 / B:59 O:0 / B:0 0.017749 1.064950 Del
180 104 2026-09-04 M:9 / W:36 285 Shift B P2.CU.3 11.60 x 910.00 x 1820.00 FA B4 G2 60 P:0 / B:60 O:0 / B:0 0.017556 1.053343 Del
179 348 2026-09-04 M:9 / W:36 446//445 Shift B P2.CU.3 11.60 x 915.00 x 1830.00 FA B4 G2 56 P:0 / B:56 O:0 / B:0 0.017749 0.993954 Del
177 341 2026-09-04 M:9 / W:36 X Shift A P2.CU.3 14.60 x 1220.00 x 2440.00 MA B4 G1 15 P:2 / B:13 O:0 / B:35 0.040484 0.607267 Del
175 114 2026-09-04 M:9 / W:36 399 Shift B P2.CU.1 2.70 x 915.00 x 1830.00 FJB E1 UTY E 84 P:6 / B:78 O:0 / B:0 0.003684 0.309438 Del
173 115 2026-09-04 M:9 / W:36 481 Shift A P2.CU.2 2.70 x 915.00 x 1830.00 FJB E1 UTY E 83 P:9 / B:74 O:0 / B:81 0.003684 0.305755 Del