Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
609 705//759 11.60 915.00 1830.00 FA B4 G2 0 / 40
608 781 6.00 1220.00 2440.00 FA B4 BB CC 0 / 100
607 843 11.60 915.00 1830.00 FA B4 G2 0 / 65
606 719//718 11.60 915.00 1830.00 FA B4 G2 0 / 61
605 604 11.60 915.00 1830.00 FA B4 G2 0 / 60
604 723 11.60 915.00 1830.00 FA B4 G2 0 / 35
603 468 18.00 1220.00 2440.00 FA E1 UTY 0 / 23
602 243 5.00 915.00 1830.00 FM E2 CI 17 0 / 53
601 662 5.00 915.00 1830.00 FM E2 LKL C11 7 0 / 46
600 710 5.00 920.00 2440.00 FM E1 UTY E 0 / 100

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
463 451 2026-09-12 M:September / W:37 646 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:13 / B:187 O:0 / B:187 0.006549 1.309792 Del
462 450 2026-09-12 M:September / W:37 676 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:1 / B:199 O:0 / B:199 0.006549 1.309792 Del
461 449 2026-09-12 M:September / W:37 749 Shift A P1.CU.1 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
460 448 2026-09-14 M:September / W:38 536 Shift A P1.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 20 P:0 / B:20 O:0 / B:20 0.058048 1.160952 Del
459 447 2026-09-14 M:September / W:38 536 Shift A P1.CU.2 20.50 x 1220.00 x 2440.00 MA B4 G1 21 P:0 / B:21 O:0 / B:21 0.058048 1.219000 Del
458 446 2026-09-14 M:September / W:38 536 Shift A P1.CU.3 20.50 x 1220.00 x 2440.00 MA B4 G1 19 P:0 / B:19 O:0 / B:19 0.058048 1.102904 Del
457 445 2026-09-12 M:September / W:37 701//347 Shift A P1.CU.2 20.50 x 1220.00 x 2440.00 MA B4 G1 21 P:0 / B:21 O:0 / B:21 0.058048 1.219000 Del
456 444 2026-09-12 M:September / W:37 682//697 Shift A P1.CU.2 20.50 x 1220.00 x 2440.00 MA B4 G1 24 P:0 / B:24 O:2 / B:22 0.058048 1.393142 Del
455 443 2026-09-14 M:September / W:38 682 Shift A P1.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 23 P:0 / B:23 O:0 / B:23 0.058048 1.335095 Del
454 442 2026-09-12 M:September / W:37 733 Shift A P1.CU.1 5.00 x 1220.00 x 2440.00 FA E2 CI D2 100 P:1 / B:99 O:0 / B:99 0.011907 1.190720 Del