Data Referensi (Sanding P1)
Daftar referensi data Sanding P1
| ID Sanding | No. Pallet | Tebal | Lebar | Panjang | Grade | Sisa Qty | Aksi |
|---|---|---|---|---|---|---|---|
| 346 | x | 8.60 | 915.00 | 1830.00 | MA B4 G2 | 0 / 14 | |
| 345 | x | 8.60 | 915.00 | 1830.00 | MA B4 G2 | 0 / 7 | |
| 344 | 605//525 | 6.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 67 | |
| 343 | 525 | 6.00 | 1220.00 | 2440.00 | FA B4 BB CC | 0 / 60 | |
| 342 | 615 | 5.00 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 110 | |
| 341 | 614 | 5.00 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 110 | |
| 340 | 361 | 9.00 | 1220.00 | 2440.00 | FA E2 CI D2 | 0 / 31 | |
| 339 | x | 9.00 | 1220.00 | 2440.00 | FA B4 BB CC LU DRI P | 0 / 17 | |
| 338 | x | 9.00 | 1220.00 | 2440.00 | FM E2 CI 17 | 0 / 59 | |
| 337 | x | 9.00 | 1220.00 | 2440.00 | FM E2 CI 17 | 0 / 52 |
Form Input Check P1
Silakan isi data dengan lengkap dan benar
Rekap Data Check P1
Daftar riwayat dan rekapitulasi data hasil check P1
| ID Check | ID Sanding | Tanggal | Mo/Wk | No. Pallet | Shift | Meja | Dimensi (T x L x P) | Grade | Qty Check | PTS / Bagus | Out / Bal | M3/Pcs | Total M3 | Aksi |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 453 | 441 | 2026-09-12 | M:September / W:37 | 545 | Shift A | P1.CU.1 | 15.00 x 1220.00 x 2440.00 | FA B4 BB CC | 48 | P:5 / B:43 | O:0 / B:43 | 0.041675 | 2.000410 | Del |
| 452 | 440 | 2026-09-11 | M:September / W:37 | x | Shift B | P1.CU.2 | 2.70 x 1220.00 x 2440.00 | FA E1 UTY | 196 | P:0 / B:196 | O:0 / B:196 | 0.006549 | 1.283596 | Del |
| 451 | 439 | 2026-09-11 | M:September / W:37 | 656 | Shift B | P1.CU.2 | 2.70 x 1220.00 x 2440.00 | FA E1 UTY | 200 | P:0 / B:200 | O:0 / B:200 | 0.006549 | 1.309792 | Del |
| 450 | 438 | 2026-09-11 | M:September / W:37 | 657 | Shift B | P1.CU.4 | 2.70 x 1220.00 x 2440.00 | FA E1 UTY | 184 | P:0 / B:184 | O:0 / B:184 | 0.006549 | 1.205009 | Del |
| 449 | 437 | 2026-09-11 | M:September / W:37 | 716 | Shift B | P1.CU.2 | 2.70 x 1220.00 x 2440.00 | FA E1 UTY | 196 | P:0 / B:196 | O:0 / B:196 | 0.006549 | 1.283596 | Del |
| 448 | 436 | 2026-09-11 | M:September / W:37 | 659 | Shift B | P1.CU.2 | 2.70 x 1220.00 x 2440.00 | FA E1 UTY | 200 | P:0 / B:200 | O:0 / B:200 | 0.006549 | 1.309792 | Del |
| 447 | 435 | 2026-09-12 | M:September / W:37 | 630 | Shift A | P1.CU.1 | 18.00 x 1220.00 x 2440.00 | FA B4 BB CC | 23 | P:2 / B:21 | O:0 / B:21 | 0.050606 | 1.163929 | Del |
| 446 | 434 | 2026-09-12 | M:September / W:37 | 654 | Shift A | P1.CU.1 | 18.00 x 1220.00 x 2440.00 | FA B4 BB CC | 33 | P:1 / B:32 | O:0 / B:32 | 0.050606 | 1.669985 | Del |
| 445 | 433 | 2026-09-11 | M:September / W:37 | 668 | Shift B | P1.CU.2 | 18.00 x 1220.00 x 2440.00 | FA B4 BB CC | 41 | P:0 / B:41 | O:0 / B:41 | 0.050606 | 2.074830 | Del |
| 444 | 432 | 2026-09-12 | M:September / W:37 | 588 | Shift A | P1.CU.2 | 18.00 x 1220.00 x 2440.00 | FA B4 BB CC | 40 | P:5 / B:35 | O:0 / B:35 | 0.050606 | 2.024224 | Del |