Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
672 734//850 14.60 915.00 1830.00 MA B4 G1 0 / 50
671 850//873 14.60 915.00 1830.00 MA B4 G1 0 / 50
670 873 14.60 915.00 1830.00 MA B4 G1 0 / 38
669 864 14.60 915.00 1830.00 MA B4 G1 0 / 42
668 935 14.60 915.00 1830.00 MA B4 G1 0 / 50
667 906//878 14.60 915.00 1830.00 MA B4 G1 0 / 50
666 917//916 8.60 1220.00 2440.00 MA B4 G1 0 / 80
665 x 18.00 1220.00 2440.00 FM E1 UTY E 0 / 20
664 906 14.60 915.00 1830.00 MA B4 G1 0 / 50
663 890//x 8.60 1220.00 2440.00 MA B4 G1 0 / 80

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
453 441 2026-09-12 M:September / W:37 545 Shift A P1.CU.1 15.00 x 1220.00 x 2440.00 FA B4 BB CC 48 P:5 / B:43 O:0 / B:43 0.041675 2.000410 Del
452 440 2026-09-11 M:September / W:37 x Shift B P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 196 P:0 / B:196 O:0 / B:196 0.006549 1.283596 Del
451 439 2026-09-11 M:September / W:37 656 Shift B P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
450 438 2026-09-11 M:September / W:37 657 Shift B P1.CU.4 2.70 x 1220.00 x 2440.00 FA E1 UTY 184 P:0 / B:184 O:0 / B:184 0.006549 1.205009 Del
449 437 2026-09-11 M:September / W:37 716 Shift B P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 196 P:0 / B:196 O:0 / B:196 0.006549 1.283596 Del
448 436 2026-09-11 M:September / W:37 659 Shift B P1.CU.2 2.70 x 1220.00 x 2440.00 FA E1 UTY 200 P:0 / B:200 O:0 / B:200 0.006549 1.309792 Del
447 435 2026-09-12 M:September / W:37 630 Shift A P1.CU.1 18.00 x 1220.00 x 2440.00 FA B4 BB CC 23 P:2 / B:21 O:0 / B:21 0.050606 1.163929 Del
446 434 2026-09-12 M:September / W:37 654 Shift A P1.CU.1 18.00 x 1220.00 x 2440.00 FA B4 BB CC 33 P:1 / B:32 O:0 / B:32 0.050606 1.669985 Del
445 433 2026-09-11 M:September / W:37 668 Shift B P1.CU.2 18.00 x 1220.00 x 2440.00 FA B4 BB CC 41 P:0 / B:41 O:0 / B:41 0.050606 2.074830 Del
444 432 2026-09-12 M:September / W:37 588 Shift A P1.CU.2 18.00 x 1220.00 x 2440.00 FA B4 BB CC 40 P:5 / B:35 O:0 / B:35 0.050606 2.024224 Del