Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
Tambah Data DB: db_rimbawana

Data Referensi (Sanding P2)

Daftar referensi data Sanding P2

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
409 661 11.60 1220.00 2440.00 MA B4 G1 0 / 45
408 652 11.60 1220.00 2440.00 MA B4 G1 0 / 48
407 586 18.00 1220.00 2440.00 FA B4 BB CC 32 / 32
406 668 18.00 1220.00 2440.00 FA B4 BB CC 0 / 41
405 509 2.70 1220.00 2440.00 FA E1 UTY 0 / 200
404 530//648 20.50 1220.00 2440.00 MA B4 G1 26 / 26
403 563 5.00 1220.00 2440.00 FA E2 CI D2 0 / 104
402 x 2.70 1220.00 2440.00 FA E1 UTY 82 / 188
401 647 2.70 1220.00 2440.00 FA E1 UTY 196 / 196
400 x 2.70 915.00 1830.00 FM E1 UTY E 0 / 85
Total: 536 data
< Prev Halaman 17 dari 54 Next >

Form Input Grading P2

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P2
2. Data Input Grading P2

Rekap Data Grading P2

Daftar riwayat dan rekapitulasi data hasil grading P2

ID Grading ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Grading PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
160 103 2026-09-03 M:9 / W:36 416 Shift A P2.CU.2 11.60 x 910.00 x 1820.00 FA B4 G2 28 P:0 / B:28 O:0 / B:32 0.017556 0.491560 Del
156 344 2026-09-03 M:9 / W:36 379 Shift A P2.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 30 P:5 / B:25 O:0 / B:0 0.058048 1.741428 Del
155 343 2026-09-03 M:9 / W:36 417//377 Shift A P2.CU.1 20.50 x 1220.00 x 2440.00 MA B4 G1 35 P:0 / B:35 O:0 / B:0 0.058048 2.031666 Del
153 341 2026-09-03 M:9 / W:36 X Shift A P2.CU.2 14.60 x 1220.00 x 2440.00 MA B4 G1 14 P:1 / B:13 O:0 / B:36 0.040484 0.566783 Del
150 280 2026-09-03 M:9 / W:36 327 Shift A P2.CU.2 17.60 x 1230.00 x 2440.00 MA B4 G1 17 P:0 / B:17 O:0 / B:0 0.049820 0.846939 Del
149 94 2026-09-03 M:9 / W:36 409//329 Shift A P2.CU.2 17.60 x 1230.00 x 2440.00 MA B4 G1 35 P:7 / B:28 O:0 / B:0 0.049820 1.743697 Del
148 342 2026-09-03 M:9 / W:36 376 Shift A P2.CU.2 20.50 x 1220.00 x 2440.00 MA B4 G1 30 P:3 / B:27 O:0 / B:0 0.058048 1.741428 Del
146 52 2026-09-03 M:9 / W:36 298 Shift A P2.CU.1 14.60 x 1230.00 x 2440.00 MA B4 G1 50 P:0 / B:50 O:0 / B:0 0.040816 2.040816 Del
145 75 2026-09-03 M:9 / W:36 374 Shift A P2.CU.1 14.60 x 915.00 x 1830.00 MA B4 G1 35 P:1 / B:34 O:0 / B:0 0.022773 0.797038 Del
144 96 2026-09-03 M:9 / W:36 386 Shift A P2.CU.1 11.60 x 915.00 x 1830.00 MA B4 G1 47 P:0 / B:47 O:0 / B:13 0.017749 0.834211 Del