Sistem Monitoring Hasil Produksi PT Rimbawana
Gunakan menu di sidebar sebelah kiri untuk navigasi modul.
DB: db_rimbawana

Data Referensi (Sanding P1)

Daftar referensi data Sanding P1

ID Sanding No. Pallet Tebal Lebar Panjang Grade Sisa Qty Aksi
559 870 11.60 915.00 1830.00 FA B4 G2 0 / 38
558 861//705 11.60 915.00 1830.00 FA B4 G2 0 / 60
557 842 11.60 915.00 1830.00 FA B4 G2 0 / 62
556 818 11.60 915.00 1830.00 FA B4 G2 0 / 60
555 860 11.60 915.00 1830.00 FA B4 G2 0 / 59
554 705 11.60 915.00 1830.00 FA B4 G2 0 / 43
553 844 11.60 915.00 1830.00 FA B4 G2 0 / 60
552 832 11.60 915.00 1830.00 FA B4 G2 0 / 60
551 833 11.60 915.00 1830.00 FA B4 G2 0 / 60
550 719 11.60 915.00 1830.00 FA B4 G2 60 / 60

Form Input Check P1

Silakan isi data dengan lengkap dan benar

1. Data Referensi Sanding P1
2. Data Input Check P1

Rekap Data Check P1

Daftar riwayat dan rekapitulasi data hasil check P1

ID Check ID Sanding Tanggal Mo/Wk No. Pallet Shift Meja Dimensi (T x L x P) Grade Qty Check PTS / Bagus Out / Bal M3/Pcs Total M3 Aksi
443 431 2026-09-12 M:September / W:37 x Shift A P1.CU.2 18.00 x 1220.00 x 2440.00 FA B4 BB CC 30 P:1 / B:29 O:0 / B:29 0.050606 1.518168 Del
442 430 2026-09-11 M:September / W:37 637 Shift B P1.CU.2 18.00 x 1220.00 x 2440.00 FA B4 BB CC 36 P:0 / B:36 O:0 / B:36 0.050606 1.821802 Del
441 429 2026-09-11 M:September / W:37 585 Shift B P1.CU.2 18.00 x 1220.00 x 2440.00 FA B4 BB CC 31 P:0 / B:31 O:0 / B:31 0.050606 1.568774 Del
440 428 2026-09-11 M:September / W:37 586 Shift B P1.CU.2 18.00 x 1220.00 x 2440.00 FA B4 BB CC 32 P:0 / B:32 O:0 / B:32 0.050606 1.619379 Del
439 427 2026-09-11 M:September / W:37 638 Shift B P1.CU.2 18.00 x 1220.00 x 2440.00 FA B4 BB CC 40 P:6 / B:34 O:0 / B:34 0.050606 2.024224 Del
438 426 2026-09-11 M:September / W:37 661 Shift B P1.CU.2 11.60 x 1220.00 x 2440.00 MA B4 G1 45 P:0 / B:45 O:0 / B:45 0.031554 1.419934 Del
437 425 2026-09-11 M:September / W:37 651 Shift B P1.CU.3 11.60 x 1220.00 x 2440.00 MA B4 G1 39 P:0 / B:39 O:0 / B:39 0.031554 1.230609 Del
436 424 2026-09-11 M:September / W:37 651 Shift B P1.CU.3 11.60 x 1220.00 x 2440.00 MA B4 G1 33 P:0 / B:33 O:0 / B:33 0.031554 1.041285 Del
435 423 2026-09-11 M:September / W:37 652 Shift B P1.CU.1 11.60 x 1220.00 x 2440.00 MA B4 G1 48 P:0 / B:48 O:0 / B:48 0.031554 1.514596 Del
434 422 2026-09-11 M:September / W:37 x Shift B P1.CU.1 11.60 x 1220.00 x 2440.00 MA B4 G1 39 P:0 / B:39 O:0 / B:39 0.031554 1.230609 Del